My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 1998-2004.PDF
QuestysFileName
COMPLIANCE INFO 1998-2004
QuestysRecordDate
5/19/2017 4:43:15 PM
QuestysRecordID
3389407
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•onitoring System Certification • <br /> Site Address: 153 E 11TH ST Date of Testing/Service: 02/06/2003 <br /> F. In-Tank Gauging / SIR Equipment ® Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ®Yes FlNo• Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ®Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No• Was accuracy of system product level readings tested? <br /> ®Yes ❑No' Was accuracy of system water level readings tested? <br /> Yes 7No' Were all probes reinstalled properly? <br /> ®Yes E]No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ®Yes No N/A (Check all that apply)Simulated leak rate: ® 3 g.p.h ❑ 0.1 g.p.h E]0.2 g.p.h <br /> ®Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑No' Was the testing apparatus properly calibrated? <br /> ®Yes ❑No' ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes L]No- ©N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ONo- ®N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes [—]No• ®N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes E]No• ®N/A For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> MYes F-]No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.