My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 2005-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2011
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 2005-2011.PDF
QuestysFileName
COMPLIANCE INFO 2005-2011
QuestysRecordDate
5/19/2017 6:00:47 PM
QuestysRecordID
3389699
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•' onitoring System Certification <br /> Site Address: 153E 11TH ST <br /> QC-D-3 Date of Testing/Service: 02/10/2009 <br /> F. In-Tank Gauging / SIR Equipment <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑x Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> QYes ❑No• Was accuracy of system product level readings tested? <br /> QYes ❑No• Was accuracy of system water level readings tested? <br /> X Yes ❑No• Were all probes reinstalled properly? <br /> 0 Yes ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : <br /> ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> KONo' <br /> ❑No• ❑N/q For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> (Check all that apply)Simulated leak rate: X❑ 3 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> X No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> No• Was the testing apparatus property calibrated? <br /> No• ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> No• Q N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> No• Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> [:]No• Q N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> No• ❑x N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.