Laserfiche WebLink
SITE HEALTH AND SAFETY PLAN <br /> 1.0 INTRODUCTION <br /> A. Overview <br /> Triton Construction is providing this site safety plan in order to address various health and <br /> safety issues regarding work at the site and to disseminate information about Triton <br /> Construction health and safety goals, procedures, and policies. <br /> B. Scope of Work <br /> This Site Health and Safety Plan was created for field work being performed at the Valero <br /> #3698, 153 E. 11'h St. Tracy CA. 95367. The scope of work at the site is as follows: Break <br /> 87 product line loose in UDC of dispenser #3-4. Replace external nut that terminates the <br /> secondary piping. <br /> 2.0 PROJECT SAFETY AUTHORITY <br /> A. On-Site Project Safety <br /> Personnel responsible for the project safety are: <br /> Anthony Spielman Project Safety Officer <br /> Mark Sullivan Company Safety <br /> Officer <br /> The Project Safety Officer and Company Safety Officer have the authority to upgrade or <br /> downgrade the provisions of this Site Safety Plan as site conditions change. In addition, the <br /> Project Safety Officer shall be responsible for the following: <br /> • Safety Supplies & Equipment Inventory for the Project Site <br /> SSP.Project No. 1 Date <br />