My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 2005-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2011
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 2005-2011.PDF
QuestysFileName
COMPLIANCE INFO 2005-2011
QuestysRecordDate
5/19/2017 6:00:47 PM
QuestysRecordID
3389699
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 6. Piping Sump Testing <br /> Test Method Developed By: ❑Tank Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Method Used: ❑Pressure ❑vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon TS STS Leak Detector Equipment Resolution:±0.002 <br /> Sump# 91 Sump# Sump# Sump# <br /> Sump Diameter: 48" <br /> Sump Depth: 31" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 27„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 24" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: ok <br /> Portion of Sump Tested 100% <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> product and water)T <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe 0 Yes 0 No (O.NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> shutdown? <br /> Was fail-safe verified to be <br /> operational?' 0 Yes 0 No NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Wait time: 15 min <br /> Test Start Time: 1:20 PM <br /> Initial Reading: 4.4964 <br /> Test End Time: 1:36 PM <br /> Final Reading: 4.4965 <br /> Test Duration(hh:mm): 00:16 00:00 00:00 00:00 <br /> Change in Reading: 0.0001 0.0000 0.0000 0.0000 <br /> Pass/Fail Threshold or Criteria: ±0.002 ±0.002 ±0.002 ±0.002 <br /> Test Result: # Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? Q Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and *Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments: <br /> 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.