My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:35:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
5/19/2017 9:21:29 PM
QuestysRecordID
3390491
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES I I <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): /9" yyy/Jiv�tryGG f0/{ <br /> THS vee��r � j,y� k �,� ✓u6x-/ r��c <br /> ` /JIG O/Jayni 0 / X OOS /516 !� <br /> .;E0 4-CG /0 T 1"C C <br /> �1'n-!J �L� C •9�, <br /> /t ,,r I-L6X /3 tiV T <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 7Ff /`Y�IJ lti(e- v`L�C 4,C— 016 "M- ^, TCJ .2'%,7 7Via <br /> T4/Lr /t C Srf/L kNi re-/ / 1 iQ e_X ClZ <br /> ` /�AT.1GGi/iC- <br /> la � ti <br /> y � D 6 y d o <br /> ti �� <br /> 5r,X� /tI5AK <br />
The URL can be used to link to this page
Your browser does not support the video tag.