Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed If in-tank gauging equipment Is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> IT Yes =itpms <br /> ll input wiring been inspected for proper entry and termination,Including testing for ground faults? <br /> r Yes all tank gauging probes visually inspected for damage and residue buildup? <br /> r Yes ccuracy of system product level readings tested? <br /> IT Yes ccuracy of system water level readings tested? <br /> r Yes all probes reinstalled properly'? <br /> r Yes all Items on the equipment manufacturer?s maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deflciencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the fallowing checklist: <br /> r Yes T No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that - <br /> r N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; 1.. 0.2 g.p.h. <br /> IT Yes IF No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> r Yes IF No* Was the testing apparatus properly calibrated? <br /> r Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> r N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off If the LLD detects a leak? <br /> r N/A <br /> r Yes IF No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> r N/A <br /> f Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> r N/A <br /> r Yes r No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> r N/A <br /> IT Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />