My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
612
>
2300 - Underground Storage Tank Program
>
PR0517321
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
11/4/2018 4:43:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0517321
PE
2381
FACILITY_ID
FA0013337
FACILITY_NAME
SOUZA II LLC (VACANT LOT)
STREET_NUMBER
612
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23439018
CURRENT_STATUS
02
SITE_LOCATION
612 W ELEVENTH ST
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\612\PR0517321\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Location <br />Souza <br />F4 <br />VATION CERTIFICATI� <br />g, 612 W. 11th St. Tracy, C, <br />Phone No. (209)835-8330 <br />Contractor Jim Thorpe Oil, Inc. Phone No. (2O9)368—Fi775 License No.gra5acia <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />X A. Pea gravel --smooth, rounded material not more than one-half (112) inch in diameter <br />_ B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />tmeasurement. (Use of he backfill material and ctanksipTestaadcof poly rushed rock will not be permitted <br />glass f or smidar atenals-or backfill if j will be made between <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* Richard Th <br />Name (Print) <br />* Contractor <br />I el <br />7gnature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.