Laserfiche WebLink
ESWEEPSO <br /> ITT NATE: <br /> I y ADDRESS: � / s 7/ < C <br /> � () TAMKOTANK M(DEL/MATERIAL•ITY RAI L� J T: '04G <br /> A I <br /> TANKS TO BE INSTALLED Alm TESTED IN ACCORDANCE <br /> VI �D� ALL WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> it i ➢ 36 � � 70� <br /> < � <br /> E L <br /> D S ✓ ALU�i�0 /`� <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> �. . 1. LIST PLANIS AlSMITTED/ FEES PAID CH+S CODE 25287, CCR 2635 (D) (8) <br /> _'�///1� d✓ 2. UST INS7ALUT IDM PUNS APPROVED (GOR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 4 vi,i. ; '3. IMSPECTIOW OAND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/MIN: BRIME(LIQUID AMMUL.AR): OTHER: <br /> ;;SMART TANK TEST: PSI: HRS/MIM: <br /> 3 G�G ✓ G iS. TANK APPROPRIATELY PLACED WITH APPROVED SACXFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS / <br /> 4--1_ ✓ PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br /> ✓ SECONDARY PIPING CONTAINMENT TEST L'�PSI:bt HRS/M6: OTHER: (CCR 2635 (A) (4)) <br /> y ` <br /> S. LAKE TEST ON ALL SAPS (24 HR. MINIMUM) NRS: (CCR 2635 (A)) <br /> UNUSED TANK OPENINGS SEALED AMD CORROSION PROTECTED (CCA 2635) <br /> OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> (�•( �'V �jV ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> (� / V PERFORMANCE TEST FOR -ALL- MONITORING PROBES (CCR 2632 (C) (2)) <br /> V PERFORMAMCE TEST OF CONTINl10U5 MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> PERFORMANCE TEST OF LIME LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br /> 1 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br /> N 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> (, V OVERFILL PROTCTIOM INSTALLED/APPROVED <br /> RADCOCK 2635 (E) (2)) <br /> /.i TANK ACCESS PORTS BROUGHT TO GE (LOCKED AMD WATERTIGHT) (CCR 2631 (D) (5)) _ <br /> 9 ]9. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> hf AAND MONITORING PM, RESPONSE PLAN ALOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 9 1. •C• FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> d , 9_ MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR Z641-Z644) <br /> 23. ALL CCIDITICNS NET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COMMENTS: <br /> EHZ3-006 3/92 <br />