My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
2300 - Underground Storage Tank Program
>
PR0231390
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:48 AM
Creation date
11/4/2018 4:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231390
PE
2381
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\757\PR0231390\INSTALL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US( SYSTEM PRINTSET INFORMATION <br /> I. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location and number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5• Detail of tank, piping system, excavation and cover. <br /> 6. Tank(s) and piping approved by a natio ally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2651 (r) L 26351 <br /> 7. verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, eta [Section 2635 (b) (2)] <br /> g• Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systema before covering. <br /> (Section 2635 (b) (6) b (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. (Section 2635 (b) (7)I <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health 4 Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK Y tl��. ` x B S 'l <br /> CAPACITY �(O. <br /> ,MANUFACTURER To If <br /> CCMPOS:TION <br /> MODEL <br /> PRODUCT <br /> C'RROSICR PROTECTION <br /> U.L. LISTED <br /> CC14PATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). (Section 2635 (b) (4)] <br /> C. Fibergtass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dim ions and materials. <br /> _ (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap 'bubble test prior to installation. <br /> _ D. Ncn-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and coaporents (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-arvual inspection requirement). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.