My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
2300 - Underground Storage Tank Program
>
PR0231390
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:48 AM
Creation date
11/4/2018 4:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231390
PE
2381
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\757\PR0231390\INSTALL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Secondary container other double-walled tanks (includes intereeptic <br /> and detection systems). (M tion 2633 (f)3 <br /> A. Backfill in secondary container. [Section 2635 (c) 1-83 <br /> S. Pore space of granular material used as backfill for primary container s) complies with Section 2631 <br /> (g). (Engineering data to support capacity requirement]. <br /> C. Two or more primary containers within secondary container. (include information on product <br /> cca"tibility) <br /> 0. Secondary container capable of precluding highest anticipated groundwater. <br /> E. Secondary container sloped to a monitoring sump frog which leakage or precipitation can be detected <br /> and removed. <br /> F. Vater tight corner which extends at least a foot beyond each boLndary of the secondary container <br /> excavation, sloped to drain away from excavation. <br /> 20. Secondary container(s) thickness, density, composition, product compatibility. <br /> Sized to contain unauthorized releases from primary containers to allow sufficient time for detection and removal. <br /> [Section 2631 (c)] <br /> 21. Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> and (2)] <br /> A. Single primary containers - 100%. <br /> B. Multiple primary containers - 150% of largest primary container or 10% above aggregate. <br /> 22. Secondary container(s) open to rainfall. [ Section 2631 (f)] <br /> ,J\ Volumetric requirements = 24 hours of 100 year storm in addition to primary container volumes. <br /> 23. Secondary container floor. [Section 2631 (03 <br /> A. Constructed on firm base. <br /> S. Sloped to collection sump ( 1/8 inch per foot). <br /> (1) One or more access casings installed in sump. <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to grand surface. <br /> (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> (d) Thickness allows for anticipated stresses. <br /> _ (e) Co truction materials are not wakened stored product or will not donate, <br /> capture, or mask constituents to be monitored. <br /> 24. Membrane liner specificatiorus. [Section 2631; k, 1, and m] _ <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.