Laserfiche WebLink
Attempt to extinguish a blaze ONLY if no compressed gas or chemical containers are involved. <br /> Instruct Fire Department personnel as to the materials/chemicals involved upon their arrival. <br /> 11.4 Inclement Weather <br /> The Project Manager or designee will suspend on-site excavation activities whenever excessive <br /> rainfall may cause contaminated soils to be washed off-site or onto clean areas on site. <br /> Due to the shock hazard, site operations will be suspended in the event of a thunderstorm. <br /> Site crews will take whatever means are required to prevent erosions and surface transport of <br /> contaminated soils. Control measures will include placement of geofabric,construction of berms, <br /> and other techniques that are commonly used in normal excavating practice. <br /> 12.0 EVACUATION PLAN <br /> Total evacuation of the area may be required if the incident is of such magnitude that it cannot <br /> be controlled by on-scene personnel. Evacuation shall occur in the following sequence: <br /> Personnel shall leave the area via the most direct route, if it is safe to do so. Equipment <br /> operators shall position their equipment as far from the immediate danger as possible. <br /> Personnel leaving the site shall proceed immediately to the area designated for a head count. <br /> Personnel will then dispose of protective clothing and shower. <br /> 16 <br />