Laserfiche WebLink
24 October 2003 <br /> AGE-NC Project No. 03-1055 <br /> Page 3 of 6 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C DOther <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety lasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations.No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Jim Cornell Operate Heavy Equipment During Excavation <br /> FIELD CREW: TASK: <br /> Donna Sexton Collect Soil Samples <br /> Field Technician if nec. Clean equipment <br /> The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced Geo Environmental,Inc. <br />