My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
95
>
2300 - Underground Storage Tank Program
>
PR0522044
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:50 AM
Creation date
11/4/2018 4:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522044
PE
2381
FACILITY_ID
FA0015011
FACILITY_NAME
PANETTA PROPERTY
STREET_NUMBER
95
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23313027
CURRENT_STATUS
02
SITE_LOCATION
95 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\95\PR0522044\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 October 2003 <br /> AGE-NC Project No. 03-1055 <br /> Page 3 of 6 <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C DOther <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety lasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations.No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Jim Cornell Operate Heavy Equipment During Excavation <br /> FIELD CREW: TASK: <br /> Donna Sexton Collect Soil Samples <br /> Field Technician if nec. Clean equipment <br /> The work party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> Advanced Geo Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.