Laserfiche WebLink
J:•H. KLEINFELDER & ASSOCI�=S <br /> .7-ane 13 , 1986 <br /> File No . : PW86-1030 <br /> Page 5 <br /> than 15% without prior written notification and documented cause : <br /> Project Coordination (permits, scheduling, $ 460 <br /> regulatory consultation, and site review) <br /> Soil Boring and Monitoring Well Installation 4300 <br /> (drilling, materials, installation) <br /> Well Development and Water Sampling 101-0 <br /> Laboratory Analyses (assumes two soil and one SOC <br /> water sample per boring analyzed for Tota.- <br /> Hydrocarbons) <br /> Report of Findings 1350 <br /> Estimated Project Cost $7980 <br /> SCHEDULE AND CONTRACT <br /> At the present time, we can schedule work to begin_ Within <br /> two weeks of notification to proceed. Enclosed is a copy of our <br /> standard environmental contract for your review. A signed copy of <br /> this contract and a $ 1500 retainer fee to cover material and <br /> laboratory costs will serve as formal authorization_ to proceed. <br /> We appreciate the opportunity to offer our services to you <br /> and look forward to your favorable consideration of our firm. <br /> Should there be any questions concerning this proposal , please do <br /> not hesitate to call our office at ,your convenience. <br /> Respectfully Submitted, <br /> J. H. KLErINNFELLDERR & ASSOCIATES <br /> C4' i <br /> l.� <br /> { <br /> Cark <br /> Director of Marketing <br /> Donald K. Rothenbaum <br /> Engineering Manager <br /> Environmental Services Division <br /> Central Valley Group <br /> CCiDKR:mkc <br /> Enc:osure <br />