My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
7717
>
2300 - Underground Storage Tank Program
>
PR0231870
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 3:04:05 PM
Creation date
11/4/2018 4:57:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231870
PE
2361
FACILITY_ID
FA0003953
FACILITY_NAME
AT&T California - UE148
STREET_NUMBER
7717
STREET_NAME
ELM
STREET_TYPE
St
City
French Camp
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
7717 Elm St
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELM\7717\PR0231870\COMPLIANCE INFO 1986-2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIROFIEXO for Fue*Jil and Generator Systems <br />April 1, 1996 <br />,.Pioneering Primary and Secondary Containment Systems <br />Application: <br />Underground Storage Tank Sump Piping Details <br />Vent Line <br />Typical Manhole <br />Transition Elbow <br />(VE3020)+ <br />Flexible <br />Vent Pipe <br />(VP2501) <br />�" tiri i"� ISI � 1�� �'i;, s.�i � � Next Page c,p°iy. <br />Fill <br />*:Available in Round and :Multisided'Configurations <br />+ VE3021 for BSPT applications <br />ESP400.07 (1 of 3) <br />Note: Only Total Containment, Inc. offers UST sump bases which can be <br />factory bonded to a TO tank (cylindrical) or factory molded with the tank <br />jacket as a single seamless unit (TotalSphere). <br />Building Wall <br />ictory installed <br />Tank Sump* <br />Fuel Oil Supply <br />Termination <br />and Return Lines <br />Assembly <br />f <br />Enviroflex supply and <br />return lines <br />Enviroflex <br />�" tiri i"� ISI � 1�� �'i;, s.�i � � Next Page c,p°iy. <br />Fill <br />*:Available in Round and :Multisided'Configurations <br />+ VE3021 for BSPT applications <br />ESP400.07 (1 of 3) <br />Note: Only Total Containment, Inc. offers UST sump bases which can be <br />factory bonded to a TO tank (cylindrical) or factory molded with the tank <br />jacket as a single seamless unit (TotalSphere). <br />
The URL can be used to link to this page
Your browser does not support the video tag.