Laserfiche WebLink
Page 2 00 00 <br />MONITORM, <br />• <br />MONITORING ALTERNATIVE$: Tank Gauging <br />Implementation of the monitoring alternative requires that the following circled items <br />be completed by the dates specified. <br />Precision test(s) must be performed by /'/ 7 and results <br />to this office within 30 days of the testa submitted <br />Tank gauging must be started immediately. (See instructions above.) <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />5/86 UGT 34 <br />