My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
7717
>
2300 - Underground Storage Tank Program
>
PR0231870
>
REMOVAL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 3:40:35 PM
Creation date
11/4/2018 4:58:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2002
RECORD_ID
PR0231870
PE
2361
FACILITY_ID
FA0003953
FACILITY_NAME
AT&T California - UE148
STREET_NUMBER
7717
STREET_NAME
ELM
STREET_TYPE
St
City
French Camp
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
7717 Elm St
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELM\7717\PR0231870\REMOVAL 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUN-IT`! <br /> ENVIRONMENTAL HEALTH DIVISION. <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 4Z7Fo.�4.i <br /> SO4 East Weber Avenue, Third Floor • Stockton, CA 9.5202 <br /> 2091468-3420 <br /> APPLICATION FOR MUNUT'TO CLOSE. <br /> UNDERGROUND STORAGE TANKS STORLNG HAZARDOUS "YIATERIALS <br /> I. GENERAL INSTRUCTIONS. <br /> 1• Submit all information in triplicate. Answer all questions, leaving no blanks_ One copy will be returned <br /> [] to the applicant with comments. <br /> j 2. Include a detailed site map an a separate sheet of pager, showing tae location of frac tanks(s), piping, <br /> streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br /> wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and <br /> distane r, of piping from tank to dispensers. If underground utilities are not included on the site map, you <br /> must state in�::riting that USA Dig will be contacted prior to excavation activities. <br /> (� 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". of 4 <br /> Samptt <br /> firm shall be an independent third parry from the contractor. <br /> L lComplete page 9, "Authorization to Release". This form must be signed and dated by the <br /> 4. <br /> OWNERIOPER- TOR of the facility. <br /> j 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br /> Worksheet". <br /> l Complete all questions on page 10, the. Public Health Ser<nces-Environmental Health Divisicn (PHS- <br /> 6. EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a signature <br /> and date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br /> completed and returned to PHS-EHD within 30 days of the tank removal. <br /> 7, Submit a "Site Health & Safety Plan" as an addendum co this application, to address all potential hazards <br /> for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by <br /> the County of:San Joaquin Building Department and the 'incorporated City Building Departments, pursuant <br /> to the Uniform Building, Code STD 70-11. <br /> L 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br /> approval of the closure plan. <br /> ( j I0. T'n_z maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br /> pian, If gross deficiencies are identified, an addendum will be required with a 58-1.00/hour fee and the <br /> review will begin on the date of resubmittal. <br /> 1!. Submit vetzf cation of the fire permit from the appropriate tire district at the removal inspection. <br /> 1 12. Advance inspection notice of at least3 hours is rep�rired by PHS-EHD. <br /> 13. Submit Contingency Plan for over-excavation at time of UST removal (if planning to over excavate). <br /> See ;III. SITE MITIGATION" on Page 2. <br /> EH a 046 (Revised 09121!00) Pave 1 <br /> �es1t1 Care' ices <br />
The URL can be used to link to this page
Your browser does not support the video tag.