My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 4:43:29 PM
Creation date
11/4/2018 5:09:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON\1329\PR0231487\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMI=4VG PROTOCOL FOR ROUTINE TANK RhAIOVALS <br /> The following represents min;rm,m sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submirted within five <br /> (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> k (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> =PIPING SAMPLES I 1 Sample every 20 lineal feet <br /> TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> T.AINK T.A.NK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NL IBER of I� <br /> (Gallons) of SOIL S?NtPLES I SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/ groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRES= IN THE TANK PTT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order <br /> to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MR41MUM NUMBER LOCATION of SOIL SAMPLES <br /> X (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 9/11/96) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.