My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
15658
>
2300 - Underground Storage Tank Program
>
PR0501326
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 11:55:24 AM
Creation date
11/4/2018 5:10:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501326
PE
2381
FACILITY_ID
FA0005067
FACILITY_NAME
DERICKSON TRUCKING
STREET_NUMBER
15658
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
22908045
CURRENT_STATUS
02
SITE_LOCATION
15658 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ESCALON BELLOTA\15658\PR0501326\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/5/2013 8:00:00 AM
QuestysRecordID
84016
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N � <br /> STATE OF CAUPOR IA '�E <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �� u° <br /> m �r . j. o <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. �""°""��. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT E:] 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO <br /> ONE ITEM F—] 2 INTERIM PERMIT F--] 4 AMENDED PERMIT E] 8 TEMPORARY TANK CLOSURE Q S TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 156 -v lo n <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> 11.TANK CONTE <br /> IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A. MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ IaUNLEA REGULAR ED DIESEL ❑ g AVIATION GAS <br /> ❑ 2 PETROLEUM E::] 80 EMPTY 1 PRODUCT El ib PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED E:]UNLEADED ❑ 5 JOTHERL(DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.R: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXESA.B,ANDC,AND ALLTHAT APPLIES INBOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ W OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 8 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO_ - <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IFAPPLICA13LE <br /> A. SYSTEM TYPE A(!! SUCTION A U 2 PRESSURE A U 3 GRAVITY A U N OTHER <br /> B. CONSTRUCTK7N A SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A® BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U a CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTORMONITORING ❑TECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITO G <br /> ❑ 8 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN O 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATELASTUSED IMO/DAY/YR) 2.ESTIMAQUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> L SUBSTANCTEDE REMAINING GALLONS INERT MATERIAL? ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# (t I C IS <br /> STATE 104 � <br /> PERMIT NUMBER '3PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE �L <br /> FORMS (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED <br /> C//ZInD/ ro <br />
The URL can be used to link to this page
Your browser does not support the video tag.