My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EUNICE
>
25433
>
2300 - Underground Storage Tank Program
>
PR0508047
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:01:31 PM
Creation date
11/4/2018 5:15:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0508047
PE
2381
FACILITY_ID
FA0007909
FACILITY_NAME
FANNIE MAE FOUNDATION
STREET_NUMBER
25433
STREET_NAME
EUNICE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00513031
CURRENT_STATUS
02
SITE_LOCATION
25433 EUNICE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EUNICE\25433\PR0508047\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> i <br /> Project t ocalion 25433 Fxutiee Rd. , Acamno, CA 95220 <br /> Owner The F'annip Map Fohmdatinn Phone No. (2n9)2'A5-202n <br /> Contractor JIM THORPE OIL, INC. Phone No. (209)36MI75 License No.495699 <br /> INDICATE MEI'IIOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion flim one of the following materials <br /> was placed In the excavation In 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(I/2) Inch in diameter <br /> B. Crashed rock--self-compncting material not more than three-quarters (3/4) Inch In cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill If contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I <br /> I berchyy cettfy thni a Solt Engineer's Compaction Report will be submitted within 30 days of roject completion or submission <br /> of vetficaton that the select material described above will be placed at a minimum of five(5Mble yards per 1600 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to Insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> • JIM TIIORPE OIL,INC. <br /> Name (Print) <br /> • LON'1'RA <br /> Ile <br /> Signature <br /> • Shall be the responsible managing employee on the license or authorized agent. <br /> i <br /> i <br /> i <br /> , <br /> ' I <br />
The URL can be used to link to this page
Your browser does not support the video tag.