Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: GEORGES MINI MART 18662 N.HIGHWAY 88 LOCKEFORD,CA 95237 <br /> - CAS. <br /> KEY <br /> Q VENTS - - <br /> �f A=ANNULAR <br /> . . . F=FILL <br /> V=VAPOR <br /> (/��J ` P=PROBE - <br /> 0 T=TURBINE <br /> 300 <br /> t/ <br /> X=SENSOR <br /> 87 <br /> i <br /> 6 . . . . . . . . 8 . <br /> T OL� <br /> 6. . . . . . . . . . 7. . . . . . <br /> 91 89 <br /> 2. . . . . . . . . . 4 <br /> . . �. <br /> 1. 3. <br /> T <br /> DIE <br /> . . . . . . . . . . - - .E-STOP. - - - . <br /> . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> C-STORE. <br /> 10S. . . . .10. .9. 9S. - <br /> . . . . . . .i . . . . . . . . . . . . . <br /> . ATC - <br /> Date map was drawn:6-19-11 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2121/07 <br />