Laserfiche WebLink
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ZANE NIMMO <br /> Cert#0083 Exp. <br /> Site: Date: Time: <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> Grade (15"Water) (.45"Water) (.95" Water) Grade (.15"Water) (.45" Water) (.95" Water) <br /> 112 ALL .08 PASS --- <br /> 3/4 ALL .08 PASS <br /> 5/6 ALL .09 PASS --- <br /> 7/8 ALL .10 PASS <br /> 9/10 ALL PASS <br /> 11/12 ALL PASS <br /> 13114 ALL PASS <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> D-drY I .44"w.c. 5 minutes PASS <br /> ❑DRY ❑DRY' ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY [--]DRY [__]DRY <br /> ml ml ml ml nil ml ml ml ml <br /> ❑DRY ❑DRY []DRY ❑DRY [__]DRY ❑DRY ❑DRY []DRY ❑DRY <br /> ml ml nil nil nit ml nil ml ml <br /> ❑DRY ❑DRY ❑DAY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> ml ml ml ml nil ml mt mi nil <br /> ❑DRY []DRV ❑DRY []DRYf-I ❑DRY [-]DRY ❑DRY []DRY []DRY <br /> ml ml ml m1 ml ml nil I nil <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles I I Breakaways PV Valves Others: <br />