Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: GEORGES MINI MART 18662 N.HIGHWAY 88 LOCKEFORD,CA 95237 <br /> . . . . . . KEY <br /> .VENTS . . . . . . . . . . . . . <br /> . . . . . A=ANNULAR <br /> F=FILL <br /> V=VAPOR <br /> ` P=PROBE <br /> T=TURBINE <br /> t <br /> . . . X=SENSOR <br /> 87 <br /> ` 6 , . . . A <br /> IF <br /> (30 <br /> 1 (ELI <br /> . . . . . . . . . .5. . . . . . 7. <br /> 91 89 . . . . _ <br /> 2. . . . . . . . . . 4 <br /> . _ . . . . . . . . �. <br /> tJ 1. . 3. <br /> 1 <br /> DI[S Z.E-STOP. <br /> C-STORE <br /> lac; <br /> Date map was drawn:-1-/ <br /> Instructions <br /> It you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the foltowing equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid levet <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2121107 <br />