Laserfiche WebLink
City of Stockton A68104 02A <br /> June 6, 1996 Page 4 <br /> TAB10E 2 <br /> Summa of -Safi Sample AA81YUcal Rets <br /> Soil Borings MW-I, B-1, B-2, and B-3 <br /> Depth FI3SCy 8 T E X TPH G <br />' mg/� <br /> mg/kg -g/kg mg/kg mg/� <br /> Soil Boring B-1 Sampling Date June 22, 1995 <br />' 3 1 ND ND ND ND ND <br /> Soil Bon ng MW-1, Sampling Date 3une 22, 1995 <br /> 20 ND ND ND ND ND <br /> 25 ND ND ND ND ND <br /> Soil Boring B-2 Sampling Date June 22, 1995 <br /> 10 ND ND ND ND ND <br /> 15 ND ND ND ND ND <br /> 20 ND I ND ND ND ND <br /> Soil Boring B-3 Sampling Date June 22 1995 <br /> 15 ND ND ND ND ND <br /> 20 ND ND ND ND ND <br /> D i R 00050=5 0 005 0 005 1-0-1 <br /> FBSG feet below site grade <br /> mg/kg milligrams per kilogram <br /> BTFX benzene, toluene ethylbenzene, xylenes <br /> TPH-G - total petroleum hydrocarbons-gasoline range <br /> ND Not detected at or above detection lirnit for reporting purposes <br /> DLR Detection limits for reporting purposes <br /> Soil cuttings and decontamination rinsate generated during the drilling operations were <br />' stored on site in Department of Transportation(DOT)-approved, sealed, 55-gallon drums <br /> On June 22, 1995, monitoring well MW-1 was constructed at the project site to a depth of <br /> approximately 40 feet BSG A monitoring well construction schematic for monitoring well <br /> MW-1 is presented in Drawing 5 Monitoring well MW-1 was sampled on June 30, and on <br /> September 26, 1995 Analytical results for the groundwater sample analyses are summarized <br />' in Table 3 <br />