My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN GATE
>
1538
>
2300 - Underground Storage Tank Program
>
PR0503406
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 11:01:36 AM
Creation date
11/5/2018 8:50:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503406
PE
2332
FACILITY_ID
FA0005835
FACILITY_NAME
STANFUL, EDGAR
STREET_NUMBER
1538
STREET_NAME
GOLDEN GATE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1538 GOLDEN GATE AVE
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GOLDEN GATE\1538\PR0503406\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
156872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD ��^ .. •. <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EAC NK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ <br /> ONE ITEM ❑ 2 INTERIM PERMIT 6 AMENDED PERMIT ] PERMANENTLY CLOSED ONSITE <br /> ❑ 8 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILTTY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.X S. MANUFACTURED BY: <br /> u c� <br /> C. DATE INSTALLED(MO/DAYHEAR) �LC D. TANK CAPACITY IN GALLONS: <br /> II.TANKC EMS IFA-1 LSMARKED,COMPLETEITEMC. <br /> A. 1 MOTOR VEHICLE FUEL ❑ d OIL B. C. ❑ 1n REGULAR <br /> DED 3 DIESEL ❑ g AVIATION GAS <br /> I PRODUCT 10 <br /> ❑ 2 PETROLEUM ❑ BD EMPTY PRE M a GASAHOL ❑ <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE O NCEAD D 5 JETFUEL ] METHANOL <br /> 99 OTHER (DESCRIBE IN ITEM D. BELOM <br /> D. IF(A1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED <br /> C.A.S.X: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALL THAT APPLIES IN BOX O AND <br /> A. TYPE OF ❑ I BLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 4 LE WALL ❑ 0 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> S. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 6 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PNmmyTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 90 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYO LINING ❑ 3 EPDXY LINING ❑ A PHENOLIC LINING <br /> C.INLININGR ❑ 5 GLASS LINING ❑ 8 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ a FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EOUIPMENTINS TALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTK)N A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH <br /> A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 SAFE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U s FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U S CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 0 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 90 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE T1014TNESS TESTING ❑ MNOTMINO ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> �❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ A AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 8 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/OAY/YR) 2.ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPRixTEo a sK,NArueq DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY X JURISDICTION X FACILITY X TANK X STAT J F/ <br /> STATE LD.# FM—1 7 L <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMITEXPIRATON WTE <br /> C , % <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS B <br />
The URL can be used to link to this page
Your browser does not support the video tag.