My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
145
>
2300 - Underground Storage Tank Program
>
PR0504311
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 2:22:12 PM
Creation date
11/5/2018 8:51:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0504311
PE
2381
FACILITY_ID
FA0006161
FACILITY_NAME
MORADA SHOPPING CENTER
STREET_NUMBER
145
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
145 N GRANT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT\145\PR0504311\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SAMPLIRG PROTOCOL FOR ROUTINE TANK REMNWALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 -4 feet. If contamination <br /> is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) working days <br /> pursuant to California Health &Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> H (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> / 1,000- 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample eve 20 liE==j <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater l <br /> interface& I below tank <br /> 4 from wall next to tank <br /> > 10.000 OR ends at soil/groundwater <br /> Tank Cluster <br /> 5 or more interface & 1 below each 1 <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLE <br /> N (Gallons) of SOIL SAMPLES J <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,Ot10 5 per Tank Center and Ends OR Sides of Tank <br /> > <br /> _10-7-1 - <br /> 0 L>'H) 5 OR More per Tank: Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 046(Revised 08/13/99) Page ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.