Laserfiche WebLink
8• IL Describe the method that will be utilized to purge and/or Inert the tank(s): .I <br /> NXS 4u, r b kb rT <br /> _�i4N <br /> b. Tank/Piping Hauler. <br /> Name /Yn e t r/� v�✓ r/1/ CL( L ©e� n g�//j' <br /> AddrtsB 337OH City d� c zip <br /> Phone No.( ZZO )_ 4/Z9 — 91 LO <br /> Hauler Rzglsb%tWu # (if hauled as hazardous) /AO y93 rs� 77 f�J /JisrfN Gq� ) <br /> c. Tank/Piping Disposal Site: <br /> Name TklA.uFr<C O� �tC QAwlf�l/%0 <br /> Address , 5� A"( R9u1 city �cR,t.yCi✓rp zip 9sfs23 <br /> Phone No.( 9/6) t/Z/ <br /> EPA Dl# (if transported to a permitted TSD facility) <br /> 9. Describe, in detall, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> GURTE2' C tf/tCT U SuUb / /AS Jq2_ Glli lir4l ,P <br /> N j G SAKI D// ritJ Gff Ur SrNC- <br /> A H.tND AU AN F //j-N� stu 5 of Es c �� T04A) U Z <br /> O•s zCr awlo�t GN.leil/ O GUSh7g/ b THt L,4BO,�,q,>5�ey <br /> 10. Describe how the excavation will be backlIlled with suitable material upon removal: <br /> C 44AJ SAIV40 suLcc /3E USE/J and fo.vt/�,gCrEIJ civ / /R <br /> CLOTS AMArfCTLMI QcAdJiT LALr .t3.f ' P,PA NFn To oi1S � 6flD <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> STh // L)r ,t 'M40 ACT e . r < rA ir�Es�) LCNtiJ utcrr/ �f�r1Y �G/1Sic� <br /> b) What will be the final destination of the excavated stockpile? <br /> X SrF 9774Gy REPO T O FtG w.rrh` Gf�uT/tAC <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> NamJI 121f -ly Hanhw Registration # <br /> Address <br /> _ City Zip <br /> Phone No. ( ) <br /> Page 5 <br />