Laserfiche WebLink
S1WRCB, January 2002 <br /> Page � of� <br /> Secondary Containment 'Westin Report port Form <br /> This farm is <br /> apprintended for Ilse by contractors performing periotic testing of USTsecondary <br /> opriate pages of this form to report results for all components tested. The contaimnent systems. Use the <br /> completed form, written test procedures, rnzd <br /> printouts from tests(if applicable), ,should be provided tp the facility owner,�operutor for submittal to the local re tato ,a <br /> �. FACILITY INFORMATION �` � gency. <br /> Facility Me <br /> L r n►�.'c <br /> Facility Date of Testing: <br /> �' =Facility C-4 <br /> one:Date Lotified of Testing ' - t_ �1 <br /> Name of Local Agency Inspector{if present during testing}; <br /> Company Name, <br /> z. TESTING CONTRACTOR INFORMATION <br /> _ <br /> Technician Conducting Test: t S <br /> Credentials: CSLB Licensed Contractor <br /> SWRCB Licensed Tank Tester <br /> License Type 'L � <br /> License Number: <br /> Manufacturer <br /> Manufacturer Training <br /> Com Hent{s) .. <br /> Date'I rainin E Iles <br /> 3. SITMM,ARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs <br /> Tested Made Component Pass Fad Not Repairs <br /> r L s I,t.L ❑ ❑ ❑ Tested Made <br /> ❑ ❑ ❑ ❑ Q ❑ ❑ j— <br /> Q ❑ ❑ 0 0 ❑ 0 <br /> Q 0 ❑ ❑ ❑ ❑ ❑ Q <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ G ❑ ❑ 0 Q ❑ <br /> Q ❑ ❑ ❑ ❑ DLl 0 <br /> ❑ <br /> ❑ ❑ ❑ ❑ ❑ n ❑ ❑ <br /> El n <br /> Q Q ❑ 1 ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was stone with the water after completion of tests: <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> r <br /> Technician's Signature: '�._ � <br /> Date: <br />