Laserfiche WebLink
Monitoring System Certification <br /> Site Address: 2420 W Grant Line Rd,Tracy Date of Testing/Servicing: <br /> A Results of Testing/Servicing <br /> Software Version Installed: e9z <br /> Complete the following checklist: <br /> Yes ❑ No* I Is the audible alarm rational? <br /> VrYes 1 ❑ No* I Is the visual alarm operational? <br /> l ryes I ❑ No* I Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper ration? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> p'N/A operational? <br /> 2'4es ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors <br /> initiate positive shutdown? (Check all that apply) d Sumpll'rench Sensors; ❑ Dispenser Containment <br /> Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor faduretdisconnectum? ff Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ErN/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill s and operating property? If so, at what percent of tank capacity does the alarm trigger? ????% <br /> ❑ Yes* R�No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* R No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If 3res,describe causes in Section E,below. <br /> ErYes ❑ No* Was monitoring stem set up reviewed to ensure proper ? <br /> Yes ❑ No* Is all gwngoring equipment operational per manufacturer's cations? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />