Laserfiche WebLink
Underground Storage Tank Monitorinyan—Page 2 of 2 <br /> VI. DISPENSER MONITORING <br /> Mso. <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) M51PANEL MANUFACTURER:Veeder Root W1 MODEL#:4-508 <br /> MSa_ <br /> LEAK SENSOR MANUFACTURER:Vcnri<p Root W3� MODEL#(S):704480-7 08 <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO Mss. <br /> WILL FAILUREJDISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK S <br /> ODEL#( ): M59. <br /> ASSEMBLY MANUFACTURER: Mss, MMw. <br /> ® 3.VISUALMONITORING DONE: ® a.DAILY ❑ b.WEEKLY(neyabo esearr avero�) <br /> ❑ 4.NO DISPENSERS <br /> M61. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD TI1A'f WE MUST IMPLEMENT ENHANCED LEAK <br /> M70 <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) M90, <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> Mei. <br /> 99.❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By January 1,2005,this facility will have a"Designated UST Operator"who has passed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July 1,2005,and annually thereafter,the "Designated UST Operator'will train facility employees in the proper operation and maintenance <br /> of the UST systems.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> D The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mas. <br /> Note regarding Section X.Pending certification of a Designated UST Operator,the following person has authority for performing the monitoring <br /> activities and maintaining leak detection equipment covered by this plan. NAME: JOB TITLE: <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br /> APPLICATION—FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> O ERATOR SIGNATU� REPRESENTING DATE: M91. <br /> ®Owner M9o. <br /> ❑error September 3, 2004 <br /> OV6ERIOPERATOR NAME(print): M91 OWNER/OPERATOR TITLE: M91 <br /> Dennis Bock Compliance Manager <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> UN-022A-3/5 www.unidocs.org Rev. 10/14/03 <br />