Laserfiche WebLink
1 FLED PROGRAM CONSOLIDATED FO! <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> Page_of <br /> VI.PIPING CONSTRUCTION(Check all that apply) <br /> UNDERGROUND PIPING I ABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458 1 0 1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 459. <br /> CONSTRUCTION/ 0 1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER ab9. ❑I.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER ®2 DOUBLE WALL O 95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER <br /> 461. MANUFACTURER 463' <br /> O 1.BARE STEEL ❑6.PEP COMPATIBLE W/100%METHANOL ❑LEASE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> 0 2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> [13.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ❑4.FIBERGLASS ®8.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> 0 5.STEEL W/COATING ❑9.CATHODIC PROTECTION 460. ❑5.STEEL W/COATING ❑95.UNKNOWN 465. <br /> VII.PIPING LEAK DETECTION(Chock all that apply)(A description ofthe nimitaing program shall a suhminMto the local Weary.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467. <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE.AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> []3. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> 04. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING 05. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW ❑7. SELF MONITORING <br /> 9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> 8. DAILY VISUAL MONITORING <br /> [:]9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ®a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> Oc. NO AUTO PUMP SHUTOFF C]c. NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT 0 11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS O 13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> []14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> 0 15. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW 0 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. [E] 1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATEINSTAI 02. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS 05. TRENCH/LINER MONITORING <br /> 2002 ®3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR []6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein d accurW to the best of my knowledge. <br /> SIGNATURE OF TO DATE: fJ Z Z Z / C;07- 4m. <br /> NAME OF OWNEIUOPERATOR(print); ` �j nn�C TITLE OF OWNER/OPERATOR //;V,r <br /> ;hC O <br /> 72. <br /> Permit Number(Agency use only) G 473. )Permit Approved By(Agency use only) 474. Permit Expiration (Agency Date(Agey use only) 475. <br /> UPCF hwfwrc-b 0/99)-3/4 http://www.unidocs.org Rcv.02/16/00 <br />