Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI,UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING 1S PERFORMED USING THE FOLLOWING METHOD 490 50-: <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY [13.ELECTRONIC STAND-ALONE ssr-Sah <br /> Q 4.NO DISPENSERS 1399.OIHER(Specify_); <br /> --- <br /> PANEL MANUFACTURER.Header Root(VR)— ---- 490-65 MODEL#:TLS 35t)R 490-sc. <br /> LEAK SENSOR MANUFACTURERVR UDC Interior 490.17 1 MODEL#(S):794380-208 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 493.50 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490.60 <br /> FAILURE I DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. it.YES ❑b.NO 490-6 <br /> UDC MONITORING STOPS THE FLAW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 49M2 <br /> 2.UDC CONSTRUCTION IS ®I.SINGLE-WALLED ❑2.DOUBLE-WALLED 49M3 <br /> IF DOUBLE WALLED: ago 60-: <br /> T UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1-QUID 2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ®a.YES ❑b.NO a9c rwh <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> MUST BE PERFORMED. PERIODIC EL.D IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR"2644.1) <br /> ®2.SECONDARY_CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> 3.SPILL BUCICKI S ARE TESTED ANNUALLY, W — --- 49067 <br /> VIII.RECORDKEEPING <br /> `Ilse following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490.638 19 Visual Inspection Records 490-68b ❑Tank integrity testing results 49a ac <br /> ❑SIR testing results(and supporting documentation records). 49068d ❑ Tank gauging results(and supporting documentation records). 49o-68e <br /> ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490488 <br /> ®Equipment maintenance and calibration records. 490-o8h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their jab duties. 49mg5n <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4so-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49tw d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49"9f <br /> ❑ SWRCB PUBLICATION:-UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-698 <br /> ❑ OTTER(Specify):M69h M69i <br /> This facility has a"Designated UST Operator'who has passed the CaUfomia UST System Operator Exam administered by the International Code Council(ICC) <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> i Operation of the UST systems in a maturer consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specked in this UST Monitoring Plan <br /> Y The facility employee's role with regard to spills and overfills as specific!in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:l)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment coveted by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated.and 3)all monitoring records are maintained Property. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME _ 49o.72 TITLE 490-73 <br /> NAME 49[-74 TITLE 490-75 <br /> The Designated Operator shall petfotm a monthly visual inspection of the facility,provide a report to the owner/operator.and inform tete ownerloperator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the bast of my knowledge. <br /> APPLICANTSIGNATU 49¢76 DATE: 4r40-77 <br /> Oct 3,2009 <br /> f <br /> APPLICAN 'DAME(print): 440.78 APPLICANT TITLE: 490-79 <br /> Dennis Dock Compliance Manager <br /> UPCF UST-D(12!2007)314 <br />