My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
1230
>
2300 - Underground Storage Tank Program
>
PR0502430
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:53:55 PM
Creation date
11/5/2018 9:36:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0502430
PE
2381
FACILITY_ID
FA0009764
FACILITY_NAME
ADM-DBA Golden Peanut & Tree Nuts Lodi
STREET_NUMBER
1230
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107014
CURRENT_STATUS
02
SITE_LOCATION
1230 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FAIRMONT\1230\PR0502430\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
4/29/2013 8:00:00 AM
QuestysRecordID
147874
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br /> FORM `B': UNDERGROUND STORAGE TANK PROGRAM <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. _ _ z <br /> MARK ONLY ❑ 1 NEWPERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK I O <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑4 AMENDED PERMIT ❑6 TEMPORARY TANK CLOSURE gf8 TANK REMOVED O <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: ^� // � N <br /> c�� S I 1)10 VC W FARM TANK-YES NO <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN—SO SPECIFY <br /> A. OWNERS TANK ID a S. MANUFACTURED BY: uk�j —4 <br /> G YEAR INSTALLED PrigD. TANK CAPACITY IN GALLONS. <br /> 11. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A 1 MOTOR VEHICLE FUEL F-1 2 PETROLEUM D. C. jj?,1 UNLEADED ❑2 LEADED ❑3 DIESEL <br /> 3 CHEMICAL PRODUCT ❑4 OIL PRODUCT ❑4 GASAHOL ❑5 JET FUEL ❑6 AVIATION GASB <br /> i ❑5 HAZARDOUS ❑80 EMPTY E]95 95 UNKNO ❑2 WASTE ❑7 METHANOL ❑ 99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.a C.A.S.a: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BO%A,B,C,&D <br /> A.TYPE OF ❑ 1 DOUBLEWALLED ❑3 SINGLE WALLED WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALLED ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> ;;af, STEEUIRON ❑2 STAINLESS STEEL ❑3FIBERGLASS ❑4STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑ <br /> MATERIAL 5 CONCRETE ❑6 POLYVINYL CHLORIDE ❑7 ALUMINUM ❑B 10D%METHANOL COMPATIBLE FRP <br /> ❑9 BONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN \❑99 OTHER <br /> C. INTERIOR F-11 RUBBER LINED ❑2 ALKYD LINING ❑3 EPDXY LINING ❑4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING ❑6 UNLINED 95 UNKNOWN / <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? E]YES E]NO 16 <br /> 90THER <br /> D. CORROSION ❑ 1 POLYETHLENE WRAP J<�2 TAR OR ASPHALT ❑ 3 VINYL WRAP F-14 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE ❑95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE AU 95 UNKNOWN A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A U 5 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASSPIPE A U 91 NONE <br /> C. MATERIAL A U 5ALUMINUM A6CONCRETE A U 7STEEL CLAD W/FRP A U B /DO%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 5 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 8 / VISUAL CHECK P 8 2 INVENTORY RECONCILIATION S 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P 8 5 GROUND WATER MONITORING WELLS <br /> P S 6 PRECISION TESTING P S 7 PRESSURE TESTING S 91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1.ESTIMATED DATE LAST USED(MO/YR) 2.ESTIMATED QUANTITY OFGALLONS S.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING IN INERT MATERIAL? ❑YES E] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY a JURISDICTION a AGENCY a FACILITY ID a TANK ID a <br /> d2 <br /> CURRENT LOCAL AGENCY FACILITY IDN APPROVED BY NAME PHONE N WITH AREA CODE <br /> IN S <br /> PERMIT NUMBER PERMIT APPROVAL DATE PE MITE (RATION DATE <br /> CHECK M PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPTN BY: <br /> \Vy FoRM B(6-29-88) THIS FORM MUST BE ACCOMPANI[U BY A FACILITY/SITE APPLICATION, FORM 'A',UNLEE 'URRENT FORMA' HAS BEEN FILED <br /> DATA PROCESSING COPY iVOW - <br />
The URL can be used to link to this page
Your browser does not support the video tag.