<br /> ll
<br /> PROJECT SCOPE OF WORK PROJECT CONTACTS SHOP DRAWING LIST
<br /> DRAWING TITLE
<br /> _T -
<br /> "THE WORK TO BE DONE SHALL BE ACCORDING TO 77 _0 OVER SHEET Ljc3FE OF W�RK
<br /> THESE PROJECT DRAWINGS AND INCLUDES, -
<br /> LODI MEMORIAL HOSPITAL 02 _F_-, SITE PLAN
<br /> A) REPLACEMENT OF 'THE EXISTING EMERGENCY GENERATOR FUEL SYSTEM WITH A NEN FUEL SYSTEM 03 -2 MECHANICAL. FLOOR PLAN
<br /> FOR THE EMERGENCY GENERATORS, 975 SOUTH FAIRMONT AVENUE 04 GP-00 UST EQUIPMENT LIST
<br /> LODI, CA 95240
<br /> 0 GP----01 UST REMOTE FILL SECTION
<br /> 6) INSTALLATION OF ONE (1) NEW 20,000 GAL. DOUBLE WALL FIBERGLASS DIESEL UNDERGROUND
<br /> 06 7P02 UST ELEVATIONS & SECTIONS
<br /> STORAGE TANK WITH ALL. APPLICABLE APPURTENANCES PER AB 2481 REGULATIONS AND -
<br /> REQUIREMENTS, 51TE -5 T GP-O3 LIST_MFG, ELEVATIONS
<br /> aRaLL-L_
<br /> O8 GP-04`- LIST INSTALLATION INSTRUCTIONS
<br /> C) INSTALLATION OF NEW DOUBLE WALL HYDROSTATICALLY MONITORED CONTAINMENT SUMP LODI MEMORIAL HOSPITAL
<br /> 09 7_-05 LIST SUMP AND PIPING DETAILS
<br /> RISERS WITH NEW DOUBLE WALL VACUUM MONITORED UNDERGROUND SUPPLY AND RETURN 975 SOUTH FAIRMONT AVENUE 70 P06 MISE. PIPING DETAILS
<br /> PIPING FROM UST SUMPS TO HYDROSTATICALLY MONITORED TRANSITION SUMP AT
<br /> LODI, CA 95240
<br /> 7_1 GP-07 -SIMPLEX DAY "TANK DETAILS
<br /> GRADE LEVEL TO SINGLE WALL ABOVEGROUND STEEL SUPPLY AND RETURN PIPING TO
<br /> EMERGENCY GENERATORS. 12 GP08 SIMPLEX DAY TANK WIRING DIAGRAM
<br /> 13 GE-01 LIST POWER AND DATA PLAN
<br /> D) INSTALLATION OF NEW DOUBLE WALL. VACUUM MONITORED UNDERGROUND FIBERGLASS VENT1 5aQa _74TE
<br /> -_ 0-2 VEEDER-ROOT SYSTEM WIRING DIAGRAM
<br /> _QRAW
<br /> PIPING FROM UST VENT EXTRACTOR TO HYDROSTATICALLY MONITORED TRANSITION SUMP AT 15 711 CENTRAL UTILITY PLANT FRIST FLOOR ELECTRICAL PLAN
<br /> GRADE LEVEL, 16 747-51 PANEL SCHEDULES
<br /> GARY ENGINEERING, INC
<br /> E) INSTALLATION OF NEW VEEDER-ROO1_ TLS-350 PLUS MONITORING PANEL WITH ALL NEW 4-901 MORENA BOULEVARD, SUITE 304
<br /> MONITORING DEVICES, INCLUDING BUT NOT LIMITED TO, SUMP SENSORS, INTERSTITIAL. SENSORS, SAN DIEGO, CA 92117
<br /> AUTOMATIC TANK GAUGE, OVERFILL ALARM AND ACKNOWLEDGMENT SWITCH, ANNUNCIATOR PANEL,
<br /> MINI. HYDROSTATIC SUMP SENSORS, ETC., PER AB 2481 REGULATIONS & REQUIREMENTS. MR. ROBERT G, FAUDOA. CIVIL ENGINEER
<br /> 2
<br /> F) ALL OTHER OTHER WORK INCLUSIVE TO THESE DRAWINGS, (858) 483-0620 FAX (858) 483943
<br /> MaIR
<br /> AQTQR
<br /> WESTERN PUMP, INC.
<br /> 1, L.ODI MEMORIAL HOSPITAL'S SPECIFICATIONS ARE TO BE FOLLOWED FOR ALL WORK PERFORMED AT 'THIS SITE. 3235 "F"' STREET
<br /> 2. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN ACCORDANCE WITH CALIFORNIA SAN DIEGO, CA 92102
<br /> BUILDING CODES AND SUPPLEMENTARY ORDINANCES.
<br /> MR. DEJAN RISTIC, PROJECT MANAGER
<br /> 1 CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE PRIOR To COMMENCING (619) 578--2193 FAX (619) 236-7406
<br /> Memorial
<br /> WORK AND NOTIFY LODI MEMORIAL HOSPITAL'S REPRESENTATIVE OF ANY DISCREPANCIES BETWEEN
<br /> SITE CONDITIONS AND INFORMATION SHOWN ON DRAWINGS.
<br /> 4, ALL EQUIPMENT REMOVED, EXCEPT WHERE AS NOTED TO BE REUSED, SHALL BE RETURNED
<br /> p
<br /> TO LODI MEMORIAL HOSPITAL, Mon"NuMMAN VICINITY MAP
<br /> mun a
<br /> o s
<br /> 5. CONTRACTOR SHALL FOLLOW THE LATEST EDITION OF THE COUNTY OF SAN JOAQUIN SITE ASSESSMENT AND
<br /> MITIGATION MANUAL FOR GUIDANCE IN ENCOUNTERING CONTAMINATED SOIL,
<br /> EUREKA AVE
<br /> 6. CONTRACTOR TO PROVIDE ALL NECESSARY BARRICADES TO ASSURE PROJECT IS FROPERLY
<br /> SAFEGUARDED DURING CONSTRUCTION, DURING THREAT OF RAIN, CONTRACTOR TO INSTALL
<br /> SAFEGUARDS TO PROTECT JOB SITE/SURROUNDING AREA FROM DAMAGE, FLOODING, ETC.
<br /> 7, CONTRACTOR TO CONTINUALLY POLICE AREA TO KEEP PREMISES AS NEAT AS POSSIBLE DURING
<br /> CONSTRUCTION AND ASSURE THE FACILITY IS DISTURBED AS LITTLE AS POSSIBLE,
<br /> E. LODL&YE_._-
<br /> 8. CONTINUOUS MONITORING DEVICE MUST BE OPERABLE PER MANUFACTURER'S SPECIFICATIONS
<br /> PRIOR TO THE DEUVERY OF FUEL TO THE UST SYSTEM.
<br /> n nA 0= g 99
<br /> VINE ST.
<br /> u
<br /> _7 ,__ SOUTH FAIRMONT AVE N U E
<br /> 9
<br /> CARDINAL ST,
<br /> - 240
<br /> LODI CAUFORMA 957
<br /> EST KETTL.EMAN LANE
<br /> N
<br /> EU 7EKA_6yj
<br /> _ LOCI
<br /> \4E--
<br /> F
<br /> NOVEMBER a4" 2007
<br /> T
<br /> PROJECT SITE
<br /> SAN JOAQUIN COUNTY HAZARDOUS MATERIAL NOTES CITY OF LODI FIRE DEPT, NOTES
<br /> t FIRE PROTECTION, INCLUDING FIRE APPARATUS ACCESS ROADS AND WATER lt TANK VENT PIPING SHALL. HAVE A MINIMUM 1--1/4 INCH INTERNAL DIAMETER 21. D,W, FIBERGLASS CONTAINMENT SUMPS SHALL BE CONTINUOUSLY
<br /> SUPPLIES FOR FIRE PROTECTION, SHALL BE INSTALLED AND MADE SERVICEABLE AND BE SIZED TO PREVENT EXCESSIVE BACK PRESSURE ON TANKS. MONITORED VIA HYDROSTATIC BRINE SOLUTION, THE INTERNAL SUMP
<br /> CONTINUOUS MONITORING DEVICE SYSTEM
<br /> 1. UST INSTALLATION SHALL BEGIN WITHIN 6 MONTHS OF THE STAMPED APPROVAL DATE AND BE COMPLETED WITHIN PRIOR TO AND DURING TIME OF CONSTRUCTION PER CFC SECTIONS 901,3,,
<br /> SPACE SHALL HAVE CONTINUOUS LIQUID LEAK SENSORS FOR ANY
<br /> 3
<br /> 2 AND 8704
<br /> ONE (1) YEAR OF THE STAMPED APPROVAL DATE ON THE PLANS, 8704, 8704.3. 12, TANK VENT PIPING SHALL DISCHARGE VERTICALLY, TO THE EXTERIOR OF PIPING JOINT LEAKS.
<br /> t ALL CONTINUOUS MONITORING DEVICES SHALL BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS,
<br /> 2, ADDRESS SHALL BE PROVIDED FOR ALL. NEW AND EXISTING BUILDINGS IN A ..STRUCTURES, WITH THE FOLLOWING MINIMUM DISTANCES:ANY REPAIRS OR MODIFICAFIONS SHALL. BEGIN WITHIN 30 DAYS OF' 'THE STAMPED APPROVAL DATE AND BE COMPLETED S22, D.W, FIBERGLASS CONTAINMENT SUMPS SHALL BE INSTALLED ON
<br /> POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD
<br /> 2. ALL SECONDARY CONTAINMENT UNITS (e.g. TANK ANNULAR SPACES, SECONDARY PIPING, SUMPS, ETC.) MONITORED
<br /> WITHIN 90 DAYS OF THE STAMPED APPROVAL DATE ON THE PLANS. A, 5 FEET TO ANY PROPERTY LINE OR OPENING INTO A BUILDING ALL UST RISER PIPING AND MANWAYS AND A LEAK SHALL INITIATE
<br /> FOR LEAKS USING APPROVED ELECTRONIC LEAK DETECTION SYSTEMS, FRONTING THE PROPERTY PER CFC SECTION 901.4.,4.
<br /> B. 12 FEET ABOVE GRADE AND 8 FEET ABOVE FILL PIPE OPENINGAN AUDIBLE AND VISUAL ALARM THAT CAN IMMEDIATELY BE
<br /> 3, ANY CHANGES MADE TO THE ORIGINAL APPROVED PLANS WILL HAVE A WRITTEN ADDENDUM AND BE SUBMITTED AND C. 2 FEET ABOVE ROOFS OR STRUCTURAL ELEMENTS WHEN RUN NEAR OR DETECTED BY THE LIST OPERATOR AND ALL SUMPS SHALL HAVE
<br /> 1
<br /> APPROVED BY THE COUNTY OF SAN JOAQUIN DEPT, OF ENVIRONMENTAL, HEALTH. 3, VEEDER-ROOT MONITORING DEVICES WILL BE PROGRAMMED TO PERFORM THE FOLLOWING: 1 FIRE EXTINGUISHING SYSTEMS SHALL- BE INSTALLED IN ACCORDANCE WITH THROUGH A STRUCTURE, WATERTIGHT LIDS,
<br /> CBC SECTION 904 AND COMPLY WITH UBC STANDARDS 9-1 & 9-2,
<br /> 4, INITIAL REVIEW OF PLANS WILL BE MADE WITHIN 30 WORKING DAYS FROM THE DATE OF APPLICATION. A. INTERSTITIAL SENSOR; PROBE NUMBER: DUAL POINT HYDROSTATIC SENSOR #794380-302. 13, TANK VENT PIPING SHALL NOT EXTEND INTO TANKS MORE THAN 1 INCH. 21 D.W. FIBERGLASS SUMPS SHALL BE INSTALLED AS CLOSE AS
<br /> 8, SUPPLY & RETURN PIPING SUMP SENSOR; PROBE NUMBER- #794380-208. 4, A FIRE DEPT. PERMIT SHALL BE OBTAINED FOR THE INSTALLATION OF THEPOSSIBLE TO THE UNDERSIDE OF THE CONCRETE PAD, SO IT
<br /> 5, ALL LEAK DETECTION EQUIPMENT IS ON THE STATE OF CALIFORNIA APPROVED EQUIPMENT LIST. ALL UNDERGROUND C, FILL PIPING SUMP SENSOR; SUMP PROBE NUMBER: #794380.-208, NEW UNDERGROUND PIPING SYSTEM, 14, TANKS, PRODUCT AND VENT PIPING SHALL BE SECONDARILY CONTAINED AND REDUCES A PATHWAY FOR CHEMICALS TO ENTER THE BACKFILL.
<br /> STORAGE TANK (UST) EQUIPMENT SHALL. MEET VOLUNTARY CONSENSUS STANDARDS, D. AUTOMATIC TANK GAUGE (ATG) SENSOR NUMBER; #847390-109 (0,1 GPM MAGNETOSTRICTIVE PROBE). SECONDARY CONTAINMENT SYSTEMS SHALL BE COMPATIBLE WITH MATERIALS STORED.
<br /> E. OVERFILL ALARM: MODEL #790091-001 / ALARM ACKNOWLEDGMENT SWITCH: MODEL #790095-001. 5, THE FIRE DEPT. PERMIT SHALL BE UPDATED ANNUALLY PER THE CITY OF 24, PER AB 2481, THE LIST SYSTEM MUST BE TESTED AFTER
<br /> 6, THE COUNTY OF SAN JOAQUIN DEH WILL BE CONTACTED A MINIMUM OF FIVE (5) DAYS PRIOR TO INSTALLATION 15, OVERSPILL CONTAINMENT SHALL HAVE A MINIMUM CAPACITY OF 5 GALLONS
<br /> F. DOUBLE WALL CONTAINMENT SUMP SENSOR: VEEDER-ROOT MINI HYDROSTATIC SENSOR #794380-304, LODI FIRE DEPT. INSTALLATION (BUT BEFORE BEING PUT INTO SERVICE) USING
<br /> SII OF THE UNDERGROUND STORAGE TANK SYSTEMS. G. DOUBLE WALL VENT CONTAINMENT SUMP SENSOR: VEEDER.-ROOT MINI--HYDROSTATIC SENSOR #794380-304, PROVIDED AT EACH TANK FILL LOCATION AND PROVISION SHALL BE MADE FOR ONE OF THE FOLLOWING METHODS:
<br /> 6. APPLICANT UNDERSTANDS THAT ALL REQUIREMENTS PERTAINING TO WORK
<br /> SAFE REMOVAL OF CONTAINED SPILL. MATERIALS AND CONTAMINATED MATERIALS,
<br /> 7, ALL UNDERGROUND STORAGE TANKS (UST) SHALL BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS, 4, CONTINUOUS MONITORING DEVICES ARE APPROVED FOR USE WITH THE VEEDER-ROOT TLS-350 FUEL MANAGEMENT SYSTEM, PERFORMED ON OR AROUND FLAMMABLE LIQUID STORAGE TANKS SHALL BE A. ENHANCED LEAK DETECTION (EL.D), AN INERT GAS
<br /> 16, TANKS AND ALL PIPING SHALL HAVE CORROSION PROTECTION,
<br /> < 8� ALL UNDERGROUND STORAGE TANK CONSTRUCTION & TESTING SHALL BE IN ACCORDANCE WITH NATIONALLY 5� ALL ELECTRICAL SUPPLY WIRING SHALL BE HARDWIRED TO THE JUNCTION/BREAKER BOX. IN STRICT COMPLIANCE WITH THE APPROPRIATE SECTIONS OF THE PRESSURE TEST CERTIFIED BY A THIRD PARTY AND
<br /> 0 UNIFORM FIRE CODE (NFPA STANDARDS). APPROVED BY THE STATE WATER RESOURCES CONTROL
<br /> 0 RECOGNIZED CODES, 17. TIE DOWNS INSTALLED ON FIBERGLASS--COATED TANKS SHALL BE SEPARATED BOARD (SWRCB),
<br /> FROM TANK VIA DIELECTRIC MATERIAL TAHT IS WIDER THAN THE STRAPPING AND
<br /> 7. TANKS SHALL NOT BE LOCATED WITHIN 3' OF THE NEAREST BASEMENT, PIT
<br /> 0 9� ALL UNDERGROUND STORAGE TANKS (UST) SHALL BE COMPATIBLE WITH THE PRODUCT STORED. SHALL BE CONSTRUCTED OF NON-CORROSIVE MATERIAL OR COATED STEEL.
<br /> 0 ADDITIONAL INFORMATION AND/ OR PROPERTY LINE, B. A TEST METHOD DEEMED EQUIVALENT TO ELD AND
<br /> I APPROVED BY THE SWRCB IN REGULATION,
<br /> 10, DESIGN AND CONSTRUCTION OF TANKS AND ALL OTHER COMPONENTS USED TO CONSTRUCT PRIMARY CONTAINMENT 18. TANKS SHALL BE SET ON FIRM FOUNDATION AND SURROUNDED BY MINIMUM
<br /> 9- SYSTEMS SHALL BE APPROVED BY AN INDEPENDENT TESTING ORGANIZATION (e.g. UL). 1, ALL SITE INSPECTIONS WILL BE SCHEDULED A MINIMUM OF FIVE (5) WORKING DAYS IN ADVANCE OF REQUESTED DATE. 8. PRODUCT AND VENT PIPING SHALL BE SECONDARILY CONTAINED & SHALL OF 6 INCHES OF SAND OR PEA GRAVEL. TANKS SHALL ALSO BE COVERED WITH A
<br /> SLOPE TOWARD THE TANK WITH MINIMUM OF 1/4" SLOPE PER 1 FOOT OF RUN, MINIMUM OF 18 INCHES OF EARTH AND 6 INCHES OF REINFORCED CONCRETE SLAB
<br /> lt LEAK DETECTION MANUFACTURER: VEEDERROOT TLS-350 PLUS SYSTEM OVERFILL ALARM ACKNOWLEDGMENT 2. TANK SYSTEMS WILL BE INSPECTED BY THE COUNTY OF SAN JOAQUIN DEH AT THE FOLLOWING EXTENDING 1 FOOT BEYOND ALL EDGES OF THE TANK,
<br /> 9, METALLIC PRODUCT AND VENT PIPING SHALL BE INSTALLED WITH APPROVED SWING
<br /> SWITCH SET AT 90% AND 95%� CONSTRUCTION PHASES: JOINTS (AS DEFINED IN CFC ARTICLE 2) OR APPROVED LISTED FLEXIBLE CONNECTORS
<br /> 19, D, W. FIBERGLASS 'TANK SHALL BE CONTINUOUSLY MONITORED VIA HYDROSTATIC
<br /> AT THE FOLLOWING POINTS:
<br /> 12, PRIOR TO OPERATION OF TANKS, THE TANK LEVEL MONITORING SYSTEM SHALL BE -TESTED, THE FUEL LEVELS AT 90% A. PRIOR TO THE TANK BEING PLACED IN THE EXCAVATION THE LIST WILL. BE PRESSURIZED AND BRINE SOLUTION AT THE ANNULAR SPACE. ANY LEAK SHALL, INITIATE AN AUDIBLE
<br /> WILL ACTIVATE A MONITORING LIGHT AND ALARM AND AT 95% THE OVERFILL ALARM WILL SOUND AND OVERFILL DEVICE SOAP TESTED. DO NOT PRESSURE TEST THE SECONDARY CONTAINMENT TANK DIRECTLY, THE ALARM THAT CAN IMMEDIATELY BE DETECTED BY THE UST OPERATOR. SECONDARY
<br /> A. WHERE PIPING CONNECTS TO UNDERGROUND TANK FITTINGS
<br /> ADDITIONAL FUEL INTO "THE UST. CONTAINMENT TESTING SHALL BE REQUIRED UPON INSTALLATION,
<br /> WILL. NOT ALLOW ADD17 PRIMARY TANK SHUOLD BE PRESSURIZED FIRST AND THEN GRADUALLY VENT/BLEED THE AIR
<br /> INTO THE SECONDARY CONTAINMENT TANK. CONDUCT ALL PRESSURE TESTING WITH DUAL GLYCERIN
<br /> B. ON PIPING THAT IS RIGIDLY SUPPORTED OR CONNECTED BETWEEN FIXED POINTS
<br /> 13, UNDERGROUND STORAGE TANK SHALL BE NEW DOUBLE WALL FIBERGLASS UST BY CONTAINMENT SOLUTIONS. FILLED GAUGES. 20� D.W. PRODUCT (SUPPLY & RETURN) PIPING SHALL BE CONTINUOUSLY MONITORED
<br /> AND WHICH IS SUBJECT TO THERMAL EXPANSION OR DIFFERENTIAL MOVEMENTS. I
<br /> M VIA CONTINUOUS VACUUM, D.W. VENT PIPING SHALL BE CONTINUOUSLY
<br /> 14, ALL PIPING SHALL BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS, B. AFTER INSTALLATION, BUT PRIOR TO BACKFILLING, PRIMARY AND SECONDARY PIPING SHALL BE 10. ANNULAR VENT PIPING SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S MONITORED VIA CONTINUOUS VACUUM. ANY LEAK SHALL INITIATE AN AUDIBLE
<br /> PNEUMATICALLY TESTED 'To 100 PSIG. THERE SHALL NOT BE ANY LEAKAGE OR PERMANENT RECOMMENDATIONS/GUIDELINES. ALARM THAT CAN IMMEDIATELY BE DETECTED BY THE UST OPERATOR,
<br /> 15. ALL PIPING MATERIALS (PIPING, COUPLINGS, SEALANTS, ETC.) SHALL BE COMPATIBLE AND USED AS PER NATIONALLY RECOGNIZED CODES. DISTORTION FOR A MINIMUM OF 30 MINUTES.
<br /> 16. SPILL CONTAINMENT BUCKETS AND MANHOLES SHALL BE BY OPW MANUFACTURING & FRP FIBRELITE H2O RATED MANHOLE COVERS, C. DOUBLE WALL FIBERGLASS SUMPS SHALL BE CONTINUOUSLY MONITORED BY USING HYDROSTATIC BRINE
<br /> ea MONITORING OF THE DOUBLE WALL. THE INTERNAL SUMP SPACE MUST HAVE CONTINUOUS LIQUID LEAK
<br /> 17, UNDERGROUND STORAGE TANKS SYSTEM TO UNDERGO LINE INTEGRITY TESTS AT THE COMPLETION OF CONSTRUCTION, SENSORS FOR ANY PIPING JOINT LEAKS.
<br /> 18. CONTRACTOR PERFORMING WORK SHALL POSSESS A STATE OF CALIFORNIA CONTRACTOR'S LICENSE WITH CLASSIFICATION D, ALL INSPECTIONS OF SECONDARY CONTAINMENT, INCLUDING TESTING, SHALL BE IN ACCORDANCE WITH APPROVAL RECORD REVISIONS
<br /> A AND A HAZMAT CERTIFICATION, LIST INSTALLER MUST BE CERTIFIED BY THE INTERNATIONAL CODE COUNCIL (ICC) BY PASSING MANUFACTURER'S GUIDELINES, ALL D.W. SUMPS SHALL BE PNUEMATICALLY TESTED. 0, DATE REVISED APP.
<br /> t THE "UST INSTALLATION/RETROFITTING" EXAM. THE CERTIFICATION IS REQUIRED TO BE RE-CERTIFIED EVERY 24 MONTHS, MILESTONE DATE APPROVAL WESTERN PUMP, INC,
<br /> a. E, ALL PORTIONS OF THE LEAK DETECTION SYSTEM WILL RECEIVE A FINAL INSPECTION AND WITNESSED ISSUED FOR C,U,P,
<br /> V) 19, UST SERVICE TECHNICIANS MUST BE CERTIFIED BY THE INTERNATIONAL CODE COUNCIL (ICC) BY PASSING THE ......
<br /> BY THE FIRE PREVENTION OFFICER. PETROLEUM EQUIPMENT SPECIALISTS
<br /> "CALIFORNIA UST SERVICE 'TECHNICIAN" EXAM, THE CERTIFICATION IS REQUIRED 'TO BE RE-CER11FIED EVERY 24 MONTHS,
<br /> ISSUED FOR PLAN CHECK 11/12/07 GARY ENG, RGFJR
<br /> 3, ALL TANK SYSTEM INTEGRITY TESTS WILL BE FORWARDED & RT G. FAUDOA APPROVED BY THE COUNTY OF SAN JOAQUIN DEH. NoC 21734
<br /> x INITIAL DELIVERY OF FUEL TO BE APPROVED BY THE COUNTY OF SAN JOAQUIN DEH, LODI MEMORIAL HOSPITAL
<br /> 0 CIVIL
<br /> ISSUED FOR GEN. BID
<br /> 4. ALL PAYMENTS OF ALL APPLICABLE UST OPERATING FEES WILL BE SUBMITTED TO 'THE COUNTY OF SAN JOAQUIN
<br /> COVER SHEET
<br /> DEH WITHIN 30 DAYS OF FINAL INSPECTION. ......
<br /> E5 ISSUED FOR CONSTRUCT,
<br /> 975 SOUTH FAIRMONT AVENUE
<br /> 0
<br /> 5, VEED:-'R--ROO'T SENSORS SHALL BE OF THE NON-DISCRIMINATING TYPE.
<br /> EXPIRATION 09-30-09 RECORD DRAWING
<br /> LODI, CALIFORNIA 95240
<br /> 6, ALL SUMP SENSORS MUST BE SET AT THE LOWEST POINT OF THE SUMP TO DETECT THE EARLIEST
<br /> UNAUTHORIZED RELEASE POSSIBLE.
<br /> SCALE JOB NO, APPROVED
<br /> SHOP DRAWINGS PREPARED BY': N.T,S. WP17
<br /> ALERT
<br /> DRAWING DOCUMENT AND THE INFORMATION HEREIN RELATING TO GARY ENGINEERING, DRAWN�
<br /> DATE' _ _.
<br /> A 0, ___________
<br /> INC, AND ITS CLIENT HAS BEEN FURNISHED IN CONFIDENCE FOR THE PRIVATE, USE NAS 10/17/07 G-0
<br /> z
<br /> OF AUTHORIZED PERSONNEL, NO PART HEREOF' SHALL BE COPIED, DUPLICATED,SECTION 4216/4217 OF THE GOVERNMENT CODE GARY ENGINEERING, INC.
<br /> IDENTIFICATION NUMBER CHECKED BY PLOT DATE
<br /> REQUIRES A OIGALERT
<br /> DISTRIBUTED, DISCLOSED, OR MADE AVAILABLE TO OTHERS OR USED TO ANY 4,901 Morena Boulevard - Suites 304
<br /> BE ISSUED BEFORE A "PERMIT TO EXCAVATE" EXTENT WHATSOEVER EXCEPT AS EXPRESSLY AUTHORIZED IV WRITING BY GARY RGF 11/08/07 SHEET ...... OF
<br /> CA Fn Son Diego, California 92117
<br /> U) WILL BE VALID, FOR YOUR DIGALERT I.D. NO. ENGINEERING, INC. AND ITS CLIENT, ANY PERSON, FIRM, OR CORPORATION
<br /> CALL UNDERGROUND SERVICE ALERT AT RECEIVING THIS DOCUMENT, HOWEVER OBTAINED, SHALL BY VIRTUE HEREOF BE Telephone (858) 483-0620 Fox (858) 483-2943
<br /> TOLL FREE 1-800-422-4133 DEEMED TO HAVE AGREED TO THE FOREGOING RESTRICTIONS, n E-Mail GARYENGCACAOL,COM
<br /> TWO WORKING DAYS BEFORE YOU DIG
<br />
|