My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
740
>
2300 - Underground Storage Tank Program
>
PR0505111
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 11:29:39 AM
Creation date
11/5/2018 9:41:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0505111
PE
2381
FACILITY_ID
FA0006546
FACILITY_NAME
FILBERT PROPERTIES
STREET_NUMBER
740
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
740 N FILBERT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FILBERT\740\PR0505111\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O��FAr, SAN JOAQUIN COUNTtCOMMUNITY DEVELOPMENT DEPARTMENT <br /> 1610 E WQEUON AVE.SIOCx10N•CA 95205 <br /> OEVEIOM.IEW SEm9CES P"MF-12091 4663120 <br /> 14- N PIG MIMIC'12091 460-3120 <br /> MKOM MIONE:1209)•1663123 <br /> NEVIDOMIOCO MIESEMAnON F400M 12091 460.3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> ��ot <br /> Project Location 714 N. Filbert St. Stockton, CA 95-336 <br /> Owner Ramsey Real Estate Development Phone No. (209)466-8733 <br /> Contractor Jim Thorpe Oil, Inc. Phone No. (209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> X 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials wag placed In the excavation In <br /> 12" llft"I <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> inch in diameter. <br /> B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between 1 <br /> the backfill material and tanks/pipes made of poly resin glass or ' <br /> similar materials. ) <br /> DECLARATION <br /> I Thereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> Jim Thorpe Oil, Inc. <br /> Name (Print) <br /> Contractor <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.