My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
515
>
2300 - Underground Storage Tank Program
>
PR0515502
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 2:14:43 PM
Creation date
11/5/2018 9:42:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0515502
PE
2381
FACILITY_ID
FA0012195
FACILITY_NAME
MULLENIX, JOHN & CHERYL
STREET_NUMBER
515
STREET_NAME
FIRST
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22504004
CURRENT_STATUS
02
SITE_LOCATION
515 FIRST ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FIRST\515\PR0515502\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />1.0. SCOPE OF WORK: <br />Tank will be purged of all remaining residues, and these residues will be stored on site in <br />55 gallon DOT approved drums until they are hauled away for disposal by a certified <br />hazardous materials hauler. <br />The tank will be inerted with a minimum of 30 lbs. of dry ice per 1,000 gallons of tank <br />capacity. More ice will be added if necessary to displace the oxygen in the tank to a <br />concentration level below the OSHA approved lower explosive limit. When this level is <br />obtained the tank will be removed and samples will be collected per the approved work <br />plan. <br />1.1. Responsibilities of Other Agencies Present: <br />1.1.1. The Environmental Health Department is responsible for approval <br />and inspection of procedures, including excavation, sample <br />procurement and integrity of work plan. <br />1.1.2. The Fire Department is responsible for inspection relative to safe <br />procedures and condition of tank prior to removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.