My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1996 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
BILLING 1996 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 10:40:05 PM
Creation date
11/5/2018 9:43:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1996 - 2008
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
LODI OIL INC ARCO #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FLAG CITY\14931\PR0506221\BILLING 1996 - 2008.PDF
QuestysFileName
BILLING 1996 - 2008
QuestysRecordDate
8/5/2016 3:30:54 PM
QuestysRecordID
3157904
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGR60ND STORAGE TANK MkITORING PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION MOL <br /> 'LAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moz. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME FLAG CITY ARCO AM/PM Moa. <br /> FACILITY SITE ADDRESS 14931 North Flag City Blvd Mao CITY Lodi Mas <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in MMfl <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): Mm. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan ma ,etc.)which shows all required information,include it with this plan. <br /> TV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mm. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: Ir a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MIL <br /> PANEL MANUFACTURER: GILBARCO M12. <br /> MODEL#: FM_ C Mtn. <br /> LEAK SENSOR MANUFACTURER: �t��'LA dG ® MIC. MODEL#(S): [.J�OQ Mts. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKS) <br /> PANEL MANUFACTURER: MIs. MODEL MIT <br /> IN-TANK PROBE MANUFACTURER: Mlg. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY Mzo. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Mnl. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): Mu. Mil. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 MN <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ C.OTHER(Specify): Mz6. WT <br /> ❑ 6-VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Require.ognnny.Arun,.) <br /> ❑ 99.OTHER(Specify): <br /> we <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Myo_ <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mar <br /> PANEL MANUFACTURER:GILBAO M31 <br /> MODEL#: EMC M33. <br /> LEAK SENSOR MANUFACTURER: .J' q,/G PI Mia MODELMODEL#(S): �,O �j M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? �I�` <br /> WILL FAILURFIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? .YES YES ❑ b.NO M36, <br /> MECHANICAL LINE LEAK DETECTOR ❑ b.NO <br /> (MLLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK <br /> ❑ IS jETEC <br /> MLLp fO �s MODEL#(S): Ptom'1 <br /> M39 <br /> 3.3.ELECTRONIC LINE LEAK DETECTOR(FLLD)THAT ROUTINELY PERFORMS - <br /> 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo. MODEL#: M43. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 <br /> g.p.h. Moz. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Moz <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M" <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ b.EVERY 3 YEARS ❑ C.OTHER(Specify) M45. M46. <br /> Q ❑ a.ANNUALLY <br /> 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY" ❑ C.MIN.MONTHLY,@ EACH TIME SYSTEM OPERATED"" mar. <br /> "Ra .ninnry sginn 1 ""AlbwWfor mnaoring ofunburied emergency genemtar fucl piping only mHSC§252g1.5(Mg]) <br /> ❑ 6.PIPING 1S SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ <br /> 99.OTHER(Specify) <br /> Mae. <br /> UN-022A-1/5 wvrw.unidoes.org <br /> Rev.10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.