Laserfiche WebLink
5.0. PERSONNEL: <br /> 5.1. Project Manager <br /> -Manages field operations. <br /> - Ensures the Work Plan is completed on schedule. <br /> -Briefs the field teams on their specific assignments. <br /> - Participates in the preparation of the Site Safety Plan. <br /> - Serves as a liaison with public officials. <br /> 5.2. Site Safety Officer <br /> - Implements and enforces the SSP. <br /> - Assures that all on-site personnel have received a copy of the SSP, have <br /> read it, and understand it. <br /> - Conducts frequent inspections of site conditions, facilities, equipment, <br /> and activities to determine if the SSP is adequate and being followed. <br /> - Conducts daily "tailgate" meetings to explain the plan of work for the <br /> day, mention potential hazards of the site. <br /> - Ensures that protective clothing and equipment are properly stored and <br /> maintained. Knows emergency procedures, excavations routes, and <br /> notifies local emergency services when necessary. <br /> -Notifies the health and Safety Manager of all accidents and injuries that <br /> occur on site. <br /> 5.3. On-Site Personnel <br /> - Are required to document their full understanding of the SSP before <br /> starting work by signing that they have read the SSP and understand it. <br /> - Complies with the SSP. <br /> -Notifies the SSO of unsafe conditions. <br /> page 8 <br />