My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1029
>
2300 - Underground Storage Tank Program
>
PR0231105
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 12:48:03 PM
Creation date
11/5/2018 9:51:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231105
PE
2361
FACILITY_ID
FA0003729
FACILITY_NAME
POLAR WATER INC
STREET_NUMBER
1029
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13527055/56
CURRENT_STATUS
02
SITE_LOCATION
1029 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1029\PR0231105\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ap44!!N, c SAN JOAQUIN COUNTY <br /> �-® G'•A <br /> �y COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1a10 E.HAZELTON AVE.,STOCKTON,CA 95205 <br /> • fid ' T DEELOPM NT SERVICES <br /> PHONE: <br /> (209)466+1120 <br /> PWE: 8 <br /> GlFOA <br /> BOLDING PHONE:(209)466-3123 <br /> NEIGHBORHOOD PRESERVATION PHONE:(209)468-3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 1029 W. Fremont St. Stocl¢on,CA 95203 <br /> Owner Polar Water,Inc. Phone No. (209)466-6766 <br /> Contractor JIM TUORPE OIL CO., INC. Phone No. (209)-368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion <br /> that one of the following materials was placed in the excavation in 12" lifts: <br /> X A. Pea gravel -- Smoth, rounded material not more than one-half(1/2)inch in <br /> diameter. <br /> B. Crushed rock -- self-compacting material not more than three-quarters (3/4) <br /> inch in cross sectional measurement. (Use of crushed rock will not be permitted <br /> for backfill if contact will be made between the backfill material and tanks/pipes <br /> made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project % <br /> completion, or submission of verification that the select material described above will be placed at a <br /> of five(5) cubic yards per 1000 gallon tank displacement and that the entire excavation will be backfill and <br /> compacted to insure compliance with the Uniform Building Code Appendix Chapter 70. <br /> * RICHARD THORPE <br /> Name (Print) <br /> President <br /> Title- <br /> s <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> 6/91-LCBECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.