Laserfiche WebLink
y � <br /> 30 November 1998 <br /> AGE-NC Project No. 98-0518 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Timothy J. Cuellar Tank removal coordination; Site health & <br /> safety <br /> FIELD CREW: TASK: <br /> Michael Rauser Excavation supervision <br /> Equipment Operator(s) Operation of backhoe/excavator/loader/crane <br /> The works party(ies) were briefed on the content of this plan at the site on <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired,the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around waist: Leave area immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> 8.0. EMERGENCY MEDICAL CARE <br /> St.Joseph's Medical Center located at 1800 North California Street, is approximately 10 minutes <br /> from the site. A map depicting the route to this facility is attached. <br /> Local ambulance service is available at phone 911. Their response time is 10 minutes. <br /> Advanced GeoEncironmental,Inc. <br />