My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2712
>
2300 - Underground Storage Tank Program
>
PR0503487
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 8:44:26 AM
Creation date
11/5/2018 10:04:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0503487
PE
2381
FACILITY_ID
FA0005863
FACILITY_NAME
STOCKTON ROOFING COMPANY
STREET_NUMBER
2712
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343060
CURRENT_STATUS
02
SITE_LOCATION
2712 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2712\PR0503487\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
4/3/2017 9:25:45 PM
QuestysRecordID
145777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40A1%0 of TRUmTIEG SAN J ,QUIN LOCAL HEALTH DIST RIC <br /> Jal q CwiWrl'on. Pru, SEltVTNo <br /> Peklc% E. Vannuccl. Secy. City of Lodi <br /> Anthonaile van Sprona.n 1601 East Hazelton Avenue. P. 0. Box 2009 Son JoaQuinCounty <br /> E@A Pln*ontei Stockton. Callfornla 95201- City of Eaulon <br /> F«n auobee City of Manlau <br /> Oanlel L. Floras 209/488-8781 City of Ripon <br /> John 0. Meet. M.O. City 0(Stockton <br /> Wililann J. Wada Jool Khanna. M.O.. M.F.H.. OlalAel Hwilh 011ker City of Tracy <br /> Mary Anna Low San J04quln County <br /> San Joagvin County <br /> Facility NamejtiJ � <br /> Address <br /> Date of Inspection ( Inspector <br /> MONITORING ALTERNATIVE 15 <br /> Annual precision test on tank(s) and piping. <br /> L— Daily•inventory reconciliation with submission, of quarterly statement 'regarding <br /> compliance with allowable variation. <br /> _L /` Pipeline leak detectors on pressurized piping. <br /> Daily operational check of suction piping function. <br /> - Calibrated meters for inputs and withdrawals: <br /> -Weights and Measures sticker <br /> Certification by qualified repairman <br /> Implementation of this. ximitoring alternative requires that the following CIRCLED items <br /> be completed by the specified dates. <br /> / t •/ Precision test(s) must be performed by e_-i 5 and results submitted to <br /> this office within 10 days of the test. <br /> 2. Pipeline leak detectors must be installed on pressurized piping by /q <br /> Daily inventory reconciliation must be started immediately. with records maintained <br /> at the facility for review. <br /> (� Document daily check of suction piping function starting immediately. <br /> f/�. Submit quarterly Statement to Chis office that allowable variation on inventory <br /> l/ reconciliation has not been exceeded or a list of dates a.n varidtions <br /> mthat <br /> exceeded allowable. - The first statement is due by r <br /> V Dispenser meters) must be calibrated by Z / ' '`' ' with copy of <br /> (J certification or Weights and Measures sticker mini 'so1mltted to this office. <br /> 1 ( Lhe above compliance dates cannot be met , contact this office prior to the Specified <br /> date . <br /> If allowable daily inventory variation is exceeded. refer to Section 7644( f ) for <br /> required actions . <br /> 1-66 UGT I <br />
The URL can be used to link to this page
Your browser does not support the video tag.