My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2900
>
2300 - Underground Storage Tank Program
>
PR0522112
>
REMOVAL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 9:27:28 AM
Creation date
11/5/2018 10:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2003
RECORD_ID
PR0522112
PE
2381
FACILITY_ID
FA0015073
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2900
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2900 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2900\PR0522112\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />J <br />?ACKFILL EXCAVATION CERTIFIC....o/ <br />2900 E. Fremont St., Stockton, CA 95205 <br />Owner_ ^ esel p rfo�rmanrP Tor Phone No. 209) 946-0233 <br />Contractor Jim Thorpe Oil, Inc. Phone No. (209) 36R-6175 License No. 495699 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />I. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />X A. Pea gravel—smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional: <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backitll material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1009 gallon tank <br />displacement and that the entire excavation will be bacLs Med and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />Martin Thorpe <br />Contractor i <br />l <br />atgna �� <br />Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.