My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4500
>
2300 - Underground Storage Tank Program
>
PR0231571
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 3:50:27 PM
Creation date
11/5/2018 10:09:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231571
PE
2381
FACILITY_ID
FA0004031
FACILITY_NAME
MASONRY GROUP, THE
STREET_NUMBER
4500
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14332001
CURRENT_STATUS
02
SITE_LOCATION
4500 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\4500\PR0231571\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING �,OTOCOL FOR ROUTINE TANK REh.'ALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br />contamination Is documented during closure, an Unauthorized Release Notification must be completed and submitted <br />within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br />WATER NOT PRESENT IN TILE TANK PIT <br />TANK <br />TANK SIZE <br />MINIMUM NUMBER <br />LOCATION OF SOIL SAMPLES <br /># <br />(Gallons) <br />of SOIL SAMPLES <br />'r <br />< 1,000 <br />1 per Tank <br />Fill OR Pump End of Tank <br />2 <br />1,000 - 10,000 <br />2 per Tank <br />1 at each End of Tank <br />> 10,000 <br />3 or More <br />Ends and Middle OR generally <br />> 10,000 OR <br />per Tank <br />spaced along the length of the Tank <br />PIPING AND STOCKPILE <br />I X I PIPING SOIL SAMPLES I 1 Sample every 20 lineal feet 11 <br />)( h TANK & PIPING STOCKPILE SAMPLES I 2 Samples every 50 cubic yards <br />WATER IS PRESENT IN TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />[MINIMUM NUMBER <br />OIL SAMPLES <br />LOCATION of SOIL <br />SAMPLES <br />MINIMUMNUMBERof <br />WATER SAMPLES <br />(Gallons) <br />< 10,000 <br />From wall next to tank <br />< 1,000 <br />3 per Tank <br />Single Tank <br />2 <br />ends at soil/ groundwater <br />1 <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />interface <br />Ends and Middle and generally spaced along <br />> 10,000 OR <br />From wall next to tank <br />Tank Cluster <br />4 <br />ends at soil <br />1 <br />groundwater interface <br />SLAB PRESENT IN IIIE TANK PiTI <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br />order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />EH 23 047 (Revised 7/10/92) Page 7 <br />TANK SIZE <br />MINIMUM NUMBER <br />LOCATION of SOIL SAMPLES <br />(Gallons) <br />of SOIL SAMPLES <br />FTANK <br />< 1,000 <br />3 per Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />5 per Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />EH 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.