My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2300 - Underground Storage Tank Program
>
PR0231553
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 11:19:40 AM
Creation date
11/5/2018 10:09:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231553
PE
2381
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
02
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\5000\PR0231553\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> project Location Panella Trucking, Inc. , 5000 E. Fremont St. , Stockton, CA 95215 <br /> Owner Panella Tnuckina Inc _Phone No. (2nO)QLa5aQc - - <br /> contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License N0.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> X_ L submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed In the excavation In 12" lilts: <br /> A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) Inch in cross sectional <br /> theabackfillnt. (Use of cruserockmaterial and tanks/pipeswmaderof polyill nt be rresindfor glassbbe made between <br /> or similar materials.) <br /> DECLARATION <br /> I hereby certify thni a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion,or submission <br /> of verification that the select mnrerinl described above will be placed at a minimum of five(3�cublc yards per 1000 gallon lank <br /> displacement and that the entire excavation will be backfilled and compacted to Insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> Panella Trucking, Inc. , by Art Pratt <br /> Name (Print) <br /> Manager <br /> --T t e (Print) <br /> Signature <br /> • Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.