My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5643
>
2300 - Underground Storage Tank Program
>
PR0504296
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 11:23:55 AM
Creation date
11/5/2018 10:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0504296
PE
2381
FACILITY_ID
FA0006155
FACILITY_NAME
RATTO, VICTOR
STREET_NUMBER
5643
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10123018
CURRENT_STATUS
02
SITE_LOCATION
5643 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\5643\PR0504296\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
5/6/2013 8:00:00 AM
QuestysRecordID
147089
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB: TANK CLOSURE AND REMOVAL: 5643 FAST FREMONT STREET, STOCKTON, CALIFORNIA <br /> SAMPLING PROTOCOL <br /> ZEST PROCEDURES TO BE UTILIZED: TPJ-G, BTX a E, TFL AND EB <br /> THE ABOVE TESTS SHALL BE RUN ON SOIL COLLECTED FROM EACH END OF THE <br /> EXCAVATION COLLECTED UNDER EACH END OF THE TANK ( TWO SAMPLES ) . SAMPLES <br /> SHALL BE TAKEN FROM NATIVE SOIL BENEATH THE TANK S INVERT AT A COLLECTED <br /> DEPTH NOT TO EXCEED TWO TO FOUR FEET. IF CONTAMINATION IS DOCUMENTED DURING <br /> CLOSURE, AN UNAUTHORIZED RELEASE NOTIFICATION SHALL BE FILLED OUT AND <br /> SUBMITTED TO SAN .JOAUOIN COUNTY ENVIRONMENTAL HEALTH DIVISION WITHIN FIVE DAYS <br /> IF WATER IS PRESENT IN TANK PIT AT EXCAVATION, SAMPLES SHALL BE TAKEN FROM WALL <br /> NEXT TO TANK ENDS AT SOIL/GROUNDWATER INTERFACE. TESTS SHALL THEN INCLUDE <br /> TWO SOIL SAMPLES AND ONE WATER SAMPLE. <br /> CC: <br /> IIATERWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.