Laserfiche WebLink
i <br /> g, a. Describe the method that will be utilized to purge andlor inert the tank(s): �� <br /> 30LL8 <br /> b. Tank[PlPing Hauler. <br /> Name <br /> CI � — <br /> Address d D N c» 9 71p <br /> Phone No{.9-of) <br /> Hauler Registration#(i[hauled as hazardous) <br /> c, Tankni ing Disposal Site: , <br /> � ST � IA,t 2Din� <br /> Name Q <br /> Address:Vp Letx <br /> -1-3to q —city-fu tl �P = <br /> Phone <br /> EPA ID#(if transported to a permitted TSD facfuty)= <br /> 9. Is the sampling firm an independent third PartY from the contractor? YE -� N011 <br /> 9a. Describe,in detall,how the sou andfor water sample(s)beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: 1 <br /> t'�ST po,.¢ , %,S tjf fl R�}c K Fi t1 iJ i 1a A <br /> G <br /> Il. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? S��� <br /> L b >n.� Cpl Tb Lt - 1-4ia le, � CO�Cft <br /> b)What will be the final destination of the excavated stockpile? <br /> lontaminated Sou Hazardous Waste Hauler.. <br /> Name I �� 1Lc� SAL Hauler Registration# - � <br /> city <br /> Address 1 i) LS— wS 9 — <br /> Phone No.(tel <br /> Page 5 <br /> ER 23 046(Revised 08113199) <br />