Laserfiche WebLink
8. a. Describe the method that will be utilized to purge andlor Inert the tank(s): <br /> G <br /> b. TanklPipi L <br /> //ng Hauler. 1n� <br /> Name cJ—A Rn✓I A4w . w\.2 �� <br /> Address¢4bp C. N w v 9 cit _ zip � 2 -- <br /> Phone No.( _�)D ) C) O <br /> Hauler Registration#(if hauled as hazardous) <br /> C. TanklPiping Disposal Site: <br /> Name <br /> Address OitY ZIP <br /> Phone No.( ) <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an Independent third party from the contractor? YES$J\ NO(J <br /> 9a. Describe,in detail,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> A a " <br /> b)What will be the final destination of the excavated stockpile? <br /> c) ontaminated Soil Hazardous Waste Hauler: <br /> Name Z ���p�/ /I ar iv a Hauler Registration# <br /> Address city Zip <br /> Phone No.( ) <br /> EH 23 046(Revised 08113199) Page 5 <br />