My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
4201
>
2300 - Underground Storage Tank Program
>
PR0516300
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 2:39:35 PM
Creation date
11/5/2018 10:12:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516300
PE
2381
FACILITY_ID
FA0001198
FACILITY_NAME
TURNER STATION
STREET_NUMBER
4201
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20103019
CURRENT_STATUS
02
SITE_LOCATION
4201 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRENCH CAMP\4201\PR0516300\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BA'KFILL EXCAVATION CERTIFICATE <br /> Project Location {2t�1 t fiYZP qua CSP Q D 'M 'cet+� CA <br /> Owner Phone No. r� <br /> Contractor �y.'g Fn�ti��+�an'c'h <br /> Phone No--2&?-432-OGdL License No. 7,W757,7_ <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> permitted for backf <br /> the backftllnmaterial and tanks/pipUse of crushed es trade of pk will not oly resin glass or siimilarlmateriif contact will be made between <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a`minimum of five (5) cubic yards per 1000 .gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * <br /> Name rmt <br /> * <br /> tt a rmt <br /> * <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.