Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54490-54b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING X 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99._OTHER_(Specify): <br /> PANEL MANUFACTURER: a90 ss M_OD_EL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490'57 MODEL#(S) 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN Ad a.YES ❑b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES JR b.NO 49"1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Ja a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS URI.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.65 <br /> IF DOUBLE WALLED: 49x648 <br /> __UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID Q2.PRESSURE [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490 64b <br /> VII,PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETEC ION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED._23 CCR 2644_lJ_ <br /> [�2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS.__ 490-66 <br /> 3 SPILL BUCKETS ARE TESTED ANNUALLY. v 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490.68a ❑Visual Inspection Records 490.68b Tank integrity testing results 490.68c <br /> SIR testing results(and supporting documentation records). 490-68d Tank gauging results(and supporting documentation records). 490.68e <br /> ❑ATG Testing results(and supporting documentation records).490-68r ❑ Corrosion Protection 60-day logs 490.688 <br /> Equipment maintenance and calibration records. 4%-68h <br /> IX.TRAINING <br /> [3k Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> �J CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> [� STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69S <br /> ❑ OTHER(Specify):M69h.M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with degard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.49o-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The follo g persons are responsible for performing the monitoring and equipment maintenance: <br /> NAME 490-72 TITLE -fig — 490.73 <br /> NAME 490.74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFIC ON:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> AP LICANT I NATURE 490-76 DATE: 490-77 <br /> 2-- t - o`� <br /> REPR-SEtiTItiG I TmiA 0,­r'0 razor Q 2 Paohi.0­eri0 erator 3 Authonied Re reser i f Ownler <br /> APPLICANT NAME (print) 478 AP ICAN IT 'E: 490'79 <br /> S h �� <br /> UPCF UST-D(12/2007)3/4 <br />