Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM D <br /> UNDERGROUND STORAGE TANK n 1� <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION APR 0 1 2009 490-1 <br /> PLAN TYPE t.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS) ENV1RONMEN T 4FA1 TH <br /> I. FACILITY INFORMATION P-HNIN USERVICES <br /> FACILITY ID#(Agency Use Only) -1 1 1 1 1 1 11 <br /> BUSINESS NAME(Same as FACILITY NAME) 4kAAC& J a S h, C30) To S e F 1 3 <br /> BUSINESS SITE ADDRESS -��� S �E�I+CL7 I°3. CIT S �,� � I(u. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR$2632,2634,2638,2641)__ <br /> MONITORING EQUIPMENT IS SERVICED {e 1ANNUALLY ❑ 99.OTHERS ci 490-3 <br /> UIPMENER . b <br /> Q ( � �)� 490-3b <br /> III.MONITORING LOCATIONS <br /> 6'1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 34)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: LJ-1.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4N0-6 <br /> PANEL MANUFACTURER: ( 490 I MODEL#: 1. S 3Sb 490.8 <br /> - - --- --- - ------ --� - -- --------------------------- - - <br /> --T-------------T----DEL#---- <br /> LEAK SENSOR MANUFACTURER: �- 490-9 1 MODEL#(S): 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL <br /> MANUFACTURER: _ 490-12. MODEL_#: 490-13 <br /> -------------IN-TANK PROBE MANUFACTURER---- 490-14.-----------------MODEL#(S): -------------------------- <br /> 490.15 <br /> ---------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> -------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS ci 490-19 <br /> g.p.h. g�P� (Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ED 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [:] a.36 HOURS ❑ b.60 HOURS 4v 0-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY a.ANNUALLY [:1b.BIENNIALLY ❑ c.OTHER(Specify): 49900-z5 <br /> ❑99.OTHER (Specify): a 0-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:[Za.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> -- <br /> PANEL MANUFACTURER: 4131 1 MODEL#: 490-31 <br /> ------------------------------------ - ---- <br /> 490-32t---_-----' ��1 (' 4�XI-33 <br /> - LEAK SENSOR MANUFACTUREfi_-------------------------- - ------ ---1-MODEL#(S)_---1��3 iJ ----------------- -- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 01a.YES ❑b.NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. aaYES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636 __----- __ __..................................... 490-36 <br /> -- MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.b.LEAK TESTS (23 CCR§26305 r490-39 <br /> --------------------------------------------------- <br /> -----------------------49040.----•-•-•----------,------------------------------------- 490.41 <br /> ELLD MANUFACTURER(S) 1 MODEL#(S)_----- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY T&STING 490.45 <br /> TEST FREQUENCY-laa.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490.47 <br /> 5.VISUAL PIPE MONITORING. 490.48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 49049 <br /> 'Allowed for monitoring of unburied emerjtene gmerwor fuel pipingonh per HSC§25281 5(6)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-s3 <br /> UPCF UST-D(12/2007)1/4 <br />