Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN -PAGE 1 <br /> TYPE OF ACTION '1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol <br /> PLAN TYPE YMONITORING IS IDENTICAL FOR ALL UST.,AT THIS FACILITY. M02 <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME i ��S� M03 <br /> FACILITY SITE ADDRESS S 7 7 M04. CITY t G/, (MV,, Mos <br /> II. EQUIPMENT TESTMG AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mob <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel <br /> MONITORING EQUIPMENT IS SERVICED lid'1.ANNUALLY ❑ 99.OTHER fY) <br /> (S eci N107. <br /> (Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MO ORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10 <br /> 7I.CONTINUOUS ELECTRONIC MONITORING,OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> 2< <br /> SECONDARY CONTAINMENT IS: 2 a. DRY ❑ b LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM N111 <br /> PANEL MANUFACTURER: I A— a T v fi M12. MODEL#: �� 3 SU N113 <br /> LEAK SENSOR MANUFACTURER )c J'r M14 MODEL#(S): M15. <br /> ❑ 2. AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16 MODEL#: N117 <br /> IN-TANK PROBE MANUFACTURER: M18 MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY N120 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21 <br /> PROGRAMMED TESTS: ❑ a.0.l g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): Naz. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): Mee N127 <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): '128 <br /> V. PIPE MONITORING <br /> MO F!IORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) N130 <br /> I.CONTINUOUS ELECTRONIC MONITORING OF IPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM No 1. <br /> PANEL MANUFACTURER: A O O M" MODEL#: SLS .3 SV N133, <br /> LEAK SENSOR MANUFACTURER: Mia. MODEL#(S): M35 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 5, a/.YES El b.NO M36 <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SI IUTDOWN? lea.YES ❑ b.NO M37 <br /> g/1 MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK 1,S DETECTED /J <br /> MLLD MANUFACTURER(s):VM_Z hjj4 l ri,' YL(Y�T M38 MODEL#(S):�D�(Z 1 I�/�IGp '�13a <br /> ❑ 3 ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT R UTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40 MODEL#: _ N141 <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.K ❑ b.MINIMUM ANNUAL 0 1 g p h N142 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b NO 11143 <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 11144 <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) N45 N146 <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" %147 <br /> "Requires agency approval -Allowed for monitoring of unbuned emergency generator fuel piping only per HSC§25281 5(b)(3) <br /> ❑ 6 PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) N148 <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />